Original source · versioned page text
Attachment D amended SWMP
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
1 Introduction
1.1 Background
ACOR Consultants (QLD) Pty. Ltd. were engaged by Bunnings Group Limited (Client) to prepare a Site Based
Stormwater Management Plan (SBSMP) for the proposed Bunnings development in Noosaville.
2 Scope
The following items will be addressed in this report:
Lawful point of discharge for the development
Proposed concept stormwater quantity management plan for the development.
Proposed concept stormwater quality management plan for the development.
Comments on performance outcomes for the proposed development with respect to Council’s following
codes:
- Water Quality and Drainage Code (Noosa Shire Council)
3 Criteria
This report has been compiled based on:
Proposed development plans for the development prepared by Group 4 Architects (Architects).
Discussions with the Client and the consultant team.
Information obtained from Council’s online mapping system
Information obtained from Dial Before You Dig (DYBD) search results.
BR210522_SBSMP_Rev5.docx Page 5 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.