Updated Engineering Plans · MCU14/0067

Attached to the e-mail MCU14/0067 Response to Information Request.

of 6

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
LINDSAY CONSULTING PTY
                   LTD


[OCR of page images]
 

 

EROSION AND SEDIMENTATION MANAGEMENT PLAN

ENVIRONMENTAL DIARY

Sediment Control

Welly Voual Inspection or After Rainfall Evert

 

 

Objecte

   
  
  

and maintain etosion and sedimentati

 

q

 

ply with
the drawings pr
deemed nec

   

   

 

 

direction

 

and provide sediment tence

ry tikers, and other 1

   

Hed storm

  

 

Tasks and

 

Reqired

  

 
 
  
  
 
 
 
 

ary by visual inspe

d stormwater

 

hroughout the dur
ceoded

ed and

   

hydromulched upor
ied with

 

jotpath areas to be pro}

 

and channel immediately a path area

smpleted.

    

all stormwater pits

 

Parfmarce Inieatrs

Foreman to —

 

© check for erosion

 

 

rock fiker dams. are

  

all sediment tence

   

 

during

   

inp

and maintain tier

 

 

 

Monitoring

 

regular weekly basi every rainfall event. ny damaged

   

sediment 4 sit removed and

 

4, and trapps

      

 

Responsible Pesan

   

ll inspections and maintenance

 

Repating

the Environmental Diary for sediment control on a

but also a

 

every art rainfall event or other

 

 

 

sediment control measures, The Environme

    

ferintendant

 

 

ruction works

  

 

 

 

 

dime

 

Foreman to arrange for installation of additional

    

 

and/or impro

   

‘and replacen

to fier dams as required, 1p measures taken in

   

 

 

 

Proje
Principal-—
Contractor:—

 

Operational Works

RON LOGAN

 

 

 

 

 

 

 

 

 

Location:— LOT 2, RENE STREET, NOOSAVILLE
Job Ref 140821
tae 1D Repu Moritring (Weld)
p10 Tine= arjpe C2 Speci Evert Moritsng (orety dscibe rst)
sion [Corrective]
[Condition "action Corrective Action Taken
Go Reauied (Describe)
U
Sediment
Fences
feck
Fiter
Sams

 

 

 

Catchpit

 

Pavement
‘reas

 

Bottom

Embankment

 

 

Humeceptors,
ceptors /

 

Detention
Basin

 

other

 

 

 

 

 

 

 

 

[ey Speci Conmeri=

Es |

 

 

 

 

 

 

 

 

 

TREATMENT ZONE.

ZONE PLANNED FOR FUTURE LANDSCAPING SFTER RETARNG WALL
1 CONSTRUCTED. “SLT FENCE PROVIDED WITH CHUTE TD DIRECT
ALL RUNOFF DOWNSTREAM TOWARDS ASIN FOR CONTAINMENT,
PROVIDE CHECK DAWS DOWN SLOPE AS REDUIRED.

 

ZONE B:—

V7)

DRIVEWAY CONSTRUCTION AREA TO DIRECT RUNOFF TOWARDS
ASI FOR CONTAINMENT AND TREATHENT BEFORE RELEASE.

LUNE AREA WITH ROAD BASE AS REOUIRED TD MAKE ALL WEATHER
SURFACE FOR CONSTRUCTION AND REDUCE TRACKING OFF SITE.

ZONE C:—  RoAD VERGE TO BE KEPT CLEAN AND FREE FROM SILT OR
DEBRIS. BUILDER TO CLEAN DAILY OR #5 REQURED TO ENSURE

OMPLIANCE, AREA REINSTATED UPON COMPLETION,

Hl

ZONE D:—  stneer swerT REGULARLY OR AS REQUIRED TO ENSURE ARY
SILT LOSS IS COLLECTED BEFORE ENTERING STORMWATER SYSTEM.

KJ WASHING OF ROAD IS STRICTLY PROHIBITED.

 

 

 

 

 

CONSTRUCTION MANAGEMENT PLAN

 

 

 

 

 

 

 

 

   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Parernnce ten fettermonce Indcotor CONSTRUCTION MANAGEMENT PLAN DIARY
veostohun Seton oo ae sled vein aie I ei —_ ey pci aal Et LINDSAY CONSULTING °,
rejet= Operational orks
sours ot Work Ne work couched ousiy space hours without cotctoctory evidence | Principal .
of ensures token fo suppress soise and other enisions / dst Contractor- RON LOAN C7 WED 4928
— wt LOT 2, RENE STRET, NOOSALE cmt may Saas Panes (cone FA Sv ier ie
ighting No resident's complaints regarding contruction security lighting lob Ref. No: ‘until Fle Ref. Ne.
hee Ti tepinnkgey THIS DRAWING REMAINA THE PROPERTY OF
«sisting Roads No butting public reads contain soil, grovel, clay or ther such | eclar Noni Westy LINDSAY CONSULTING PTY LTD AND IS FOR
materials originating trom onsite construction activities Approx Te: ‘pr Special Event Monitoring bit describe event THE SOLE USE OF THE CLIENT. NO PART
5. Signage Ne haerad fetal nets de fe adeauecy of obsares of them Yoritore coca Te | Correstve Econ Token MAY BE USED IN PART OR WHOLE WITHOUT
= — rae Peres PRIOR EXPRESS WRITTEN CONSENT OF
6. Waste Contrt No complotts trom lca resents ond ste i Hept iy ot ol ti LINDSAY CONSULTING PTY LTD
baste Miniisoion fe scenes of an Gag onate ono watets are puseie mm CLIENT AND PROJECT DESCRIPTION
Comneas cot dhe ing song ogo ps do — RON LOGAN
rs Sou PROPOSED DEVELOPMENT
hs opened SEE i ad nn oe Ta _— LOT 2 RENE STREET
busting biosth ving ues ond wiv iy Ut, to & eas Mason NOOSAVILLE
visting nrostruture | No unplanned donoge to esting uti: ond inrostructue
12. Nen Conformances All non conformances have been reported and rectified Construction Tattc § Parking
ont The site foreman is to monitor the performance ef all construction activities and ony departure from the ‘Waste Minimisation & Recycling
fenitering Construction Management Pion control mensures is to be immediately rectifier
‘eaten Nome fiona ‘ene mmeaatay ee Ero 5 Seiten ite Enamel By DRAWING TITLE
Teipenie | These orenon b fo be vspeable fr wl ipecons nl putenance oie ortracon Fenagenn! one EROSION CONTROL
Person Flon
The site forenon bo complete the Construction Monagenent Flan Oley Undudg Enviormertel Bry tor em Venda
sediment conta on weekly boss 05 © minum. but olso offer every sgaficontranfll event (nhc
ouses site runoff) er other special event offecting the site or ony wotercourses trversing the site
Reporting |The Construction Menogenent Plan Dery ln cenjnction with the Enviermentol Dir! stall be completed Ta je lama
ad delivered to the Superintendent for recrd ond oust purposes ith each progress clon for the
constuction work SCALES
Convective The site foremon i to orronge all corrective actions, controls ond rectification octivities ond report on Sete
salons cil aeosures token in the Construction Movagenent Plon Diy
Drig. 1.100
CONSTRUCTION MANAGEMENT PLAN SURVEY DATUM
jective To comply with oll stotutery reguotione ond relesont plies, ond mince the inpoct on the Construction Inpement the etocon ond sedinentotian control measures ond oscocibted narogement plan contained
‘environment whilst corrying out construction ctivities ino sofe ond sustninoble monner. Manegenent. in the opproved plans. .
Tasks ond Actions
yasks 2 2. All earthaork stockpiles are 4s be ket moist, covered with forpoulis or otherwise deste fe
hinge ist enisins ond stored in ection which minnie the possiblity ot the sol entering the
stormwater system
wamagenent | Te tive He eorronmantol ore omuity poet of construction ocitis Prsugh onsite poodtive 5. A construction sholedoun oreo i tebe istllad of the entrance te te site to reduce arwonted ASSOCIATED CONSULTANTS
Sinan approth te consiructon processes and condequences cause ond efetl. Suceesul integration of sll am leoving the site vo veil tyres

activities will achieve ecological sustainability hich is recognized a: o balance thot integrates the

protection of ecological processes ond naturals

 

onomic de

   

pment ond mpintenance of

 

 

cultural, economic, physical ond sori wellbeing of people in commurits

 

 

Construction
Manogement

Tosks and Action

Required

The following schedule cf management strategies, tasks and actions for construction works form:
ts
included in the following schedule howe!

of

 

onstruction iesues. Irrespective of whether or not on item

 

inble monogement of site

 

the Contractor

   

shall employ best practice meosures

achieve sustoinoble outcomes ot ll times
Manogement Strategy / dion

Encure that oll

impacts ond required nininun ervironmental control meosures ond responsibilities

commancenent of any site works,

 

iturbonce of sols below the conopy of ony reto Aotion i 1

 

excluded or othe

 

rinimised in accordance with the approved plans

No dust emissions shell extend beyond the boundary of the site

of the site

No odour emissions are detectable beyond the boundor

  

  

     

  

    

   

   

 

 

the

te

off and sub contractors wotking on the site ore axare of potential environmental
before

 

vierk, including plont ond equipment meintenonce ond serviting, sholl only be carried out between the

 

point

at the nominated site

in bunded

     
 

minimise sedimer

appre an

   

  

 

 

 

 

 

 

1. A high level of site oh

b

 

 

 

 

signs of soi

entronce

they

  

 

     
  
  

d

 

   

 

 

 

 

 

 

'. Rond: butting the site and affected by the works shall be
1 whenever inspection show!

4 pover

   

 

agement technique:

includ

and Sedir

 

 

 

 

 

 

construction moter

ised cont

 

   

ernatively trans unc

her petroleum products or dangerow
areas 4 well clear of any water
any ch or stored fuels shall a

 

 

ing. tho

 

 

  

 

 

fept at regular intervals

 

1. All site stoff nnd sub contrortors sholl be directed to use the nominated shokedown entry / exif

6 required
il on on abutting rood or

ure that vermin a

 

 

  

ainers, shall either b

  

  
 
 
 
 
 

 

 

   

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

hours of 6:30am ond 63ipm Monday te Soturday inclusive, Written agreement must be provided by The and implemen

neighbouring residents it any work octivity with the potentinl to emit excessive noise is to be The Traffic shall be pr

undertoken outie the obsve mentioned hours ord even sith cuth consent, such acter ore te be cn prestart

rinsed. snc approval applicable &
5. AI equipment sholl be ocourticlly tented sith manufoctuer supplied mutter systems with ensure .

thot equa! dees tt rete anongntl Berm or exerive ase orator must be recorded in wring REVISION UST

“ “ including ony in 113 undertaken, conclusions reached and actions taken as a A [ORIGINAL ISSUE TW70B/iN
cuttylghing for the site must be designed ond locoted to ensure thot its result of same. This 4 ade available to th

not obtrusive ond drect liht sil does not olter the omenty of odjocent prepertizs administering authority
All existing ublties (roads. droinoge. electrical ond communication! on or adincent the site ore to be e sonnel are Fmances *0 the site

protected ond mointoined of oll times, with the cost of ony damage to such infrastructure to be urrence

ret by the Conroctr ervance of same

The contractor shall prepare an informative letter to

Any oreas of high sick / danger on the site ore fo be odeauntely signposted. nts/businesses adjacent the | ise cont

0. Vibration beyond the site boundary from construction octivities is to be minimised ond where there is munications tor aI working h ected timing

0 lieiood of such virotin extending bejord the boundries 40 on odng property exer, the er informatio ces rele

property evner sholl be odbised occerdingly

[enpoter Fle
140821CP.dwg
DRAWING NOMBER SHEET] REV.

14-0821-C4 LTA

 

 

 

 

 

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Updated Engineering Plans.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.