Skip to the record
For the highest quality transcripts.

Council archive · source document

Application Report · MCU10/2113.03

of 163

Text shows just the words. Original shows the document exactly as it was published.

20 Peregian Esplanade, Peregian Beach




 PERFORMANCE OUTCOMES                               ACCEPTABLE OUTCOMES                        PROPOSAL                                     COMPLIANCE
 Infrastructure protection                          AO10                                       A10                                          ☒Compliant
 PO10                                               No acceptable outcome provided             The proposed development can comply          ☐N/A
 Earthworks and vehicular access do not adversely                                              with this outcome.                           ☐Performance Solution
 impact on the capacity, operations and
 maintenance of existing infrastructure.

 Environmental protection                           AO11                                       A11                                          ☒Compliant
 PO11                                               No acceptable outcome provided             The proposed development can comply          ☐N/A
 Earthworks minimise any adverse impact upon                                                   with this outcome.                           ☐Performance Solution
 groundwater, watercourses, drainage lines,
 wetlands, and native vegetation.
 Dams                                               AO12.1                                     A12.1                                        ☐Compliant
 PO12                                               Where the site is in the Rural zone—       The subject site is not identified within    ☒N/A
 Dam location and construction does not impact      a)  the land has a slope of less than      the Rural zone. As such, this criterion is   ☐Performance Solution
 upon neighboring properties or road reserves,          25% (1:4);                             not applicable.
 in terms of—                                       b)  the earthworks including cut and
 a)    hydrology;                                       fill batters and retaining walls are
 b)    alteration of existing overland flow paths       setback a minimum of 50 metres
       and patterns;                                    from the property boundary; and
 c)    landslide or failure of dam wall; and        c)  the size of the lot is greater than
                                                        5 hectares.




                                                                                                                                                                    82

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application Report.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.