Skip to the record
Search everything, all in one place.

Council archive · source document

Application Report · MCU10/2113.03

of 163

Text shows just the words. Original shows the document exactly as it was published.

20 Peregian Esplanade, Peregian Beach




 PERFORMANCE OUTCOMES                             ACCEPTABLE OUTCOMES                          PROPOSAL                                      COMPLIANCE
  d)     effluent disposal areas.                 AO12.2                                       A12.2                                         ☐Compliant
                                                  Where the site is in the Rural               The subject site is not identified within     ☒N/A
                                                  residential zone or the Rural zone and       the Rural residential or Rural zone. As       ☐Performance Solution
                                                  the lot is less than 5 hectares:             such, this criterion is not applicable.
                                                  a)    the land has a slope of less than
                                                        1:6;
                                                  b)    the earthworks including cut and
                                                        fill batters and retaining walls are
                                                        setback a minimum of 20 metres
                                                        from the property boundary; and
                                                  c)    the dam work involves less than
                                                        500m³ of material.
                                                  AO12.3                                       A12.3                                         ☐Compliant
                                                  For all other zones—                         The proposed development does not             ☒N/A
                                                  No acceptable outcome provided               involve the construction of dams. As such,    ☐Performance Solution
                                                                                               this criterion is not applicable.


4.3      Existing Services Code

4.3.1    Purpose
 PURPOSE & OVERALL OUTCOMES                                       PROPOSAL                                                                  COMPLIANCE
1) The purpose of the Existing Services Code is to ensure existing underground infrastructure is protected from damage caused by development.
2) The overall outcomes sought for the Existing services code are:
a) Underground infrastructure is accessible for maintenance The proposed development does not involve the removal of
   purposes.                                                        existing infrastructure and will ensure existing services are ☒Compliant
b) Existing services are identified and methods of protection and protected during the delivery of the development.                   ☐N/A
   access are implemented in the design of the development.                                                                           ☐Performance Solution




                                                                                                                                                                     83

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application Report.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.