Council archive · source document
Application Report · MCU10/2113.03
20 Peregian Esplanade, Peregian Beach 4.3.2 Performance Outcomes & Acceptable Outcomes PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE Assessable development PO1 AO1 AO1 Development near a stormwater No acceptable outcome provided The proposed development is not undertaken ☐Compliant drain, overland flow path or near a stormwater drain or overland flow path. ☒N/A associated structure does not— As such, this criterion is not applicable. ☐Performance Solution a) adversely affect the function of the service; b) place an additional load on the service; and c) unduly increase future maintenance costs. PO2 AO2.1 AO2.1 Maintenance access is provided to all For trunk infrastructure, a registered The proposed development does not involve ☐Compliant stormwater drains, overland flow paths easement in favour of Council is created over trunk infrastructure. As such, this criterion is ☒N/A and associated structures. all underground infrastructure located in not applicable. ☐Performance Solution private property. AO2.2 AO2.2 ☐Compliant The width of the easement required is in The proposed development does not involve ☒N/A accordance with Council’s Planning Scheme trunk infrastructure. As such, this criterion is ☐Performance Solution Policy PSP6 Engineering Design Standards – not applicable. Roads, drainage and earthworks. AO2.3 AO2.3 ☐Compliant The easement is centred over the centreline The proposed development does not involve ☒N/A of the infrastructure. trunk infrastructure. As such, this criterion is ☐Performance Solution not applicable. 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.