Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Application Report · MCU10/2113.03

of 163

Text shows just the words. Original shows the document exactly as it was published.

20 Peregian Esplanade, Peregian Beach




4.3.2    Performance Outcomes & Acceptable Outcomes
 PERFORMANCE OUTCOMES                      ACCEPTABLE OUTCOMES                             PROPOSAL                                           COMPLIANCE
 Assessable development
 PO1                                       AO1                                             AO1
 Development near a stormwater             No acceptable outcome provided                  The proposed development is not undertaken         ☐Compliant
 drain, overland flow path or                                                              near a stormwater drain or overland flow path.     ☒N/A
 associated structure does not—                                                            As such, this criterion is not applicable.         ☐Performance Solution
 a) adversely affect the function of the
     service;
 b) place an additional load on the
     service; and
 c) unduly         increase      future
     maintenance costs.
 PO2                                       AO2.1                                           AO2.1
 Maintenance access is provided to all     For trunk infrastructure, a registered          The proposed development does not involve          ☐Compliant
 stormwater drains, overland flow paths    easement in favour of Council is created over   trunk infrastructure. As such, this criterion is   ☒N/A
 and associated structures.                all underground infrastructure located in       not applicable.                                    ☐Performance Solution
                                           private property.
                                           AO2.2                                           AO2.2                                              ☐Compliant
                                           The width of the easement required is in        The proposed development does not involve          ☒N/A
                                           accordance with Council’s Planning Scheme       trunk infrastructure. As such, this criterion is   ☐Performance Solution
                                           Policy PSP6 Engineering Design Standards –      not applicable.
                                           Roads, drainage and earthworks.
                                           AO2.3                                           AO2.3                                              ☐Compliant
                                           The easement is centred over the centreline     The proposed development does not involve          ☒N/A
                                           of the infrastructure.                          trunk infrastructure. As such, this criterion is   ☐Performance Solution
                                                                                           not applicable.




                                                                                                                                                                      84

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application Report.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.