132003.221172.6 Change to Existing Approval Notice · 132003.221172.7
Attached to the e-mail Changes form. owners consent, approved plans, copy of change approval - 132003.221172.7.
132003.221172.6
Pathway Contributions
29. A pathway contribution of $246 towards external major pathways, in accordance with
Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to
the Council prior to obtaining a Development Permit for Operational Works. This amount
will be subject to variations in the Price Index, All Groups Brisbane from June 2004 until
the date of payment.
Stormwater Drainage
30. All stormwater drainage shall be collected on site and discharged so there is no net
increase in stormwater runoff from the site. Plans of the drainage design shall be
prepared by a Registered Professional Civil Engineer and submitted to Council prior to
obtaining a Development Permit for Operational Works.
Any stormwater discharged to Council’s street drainage system shall have a maximum
discharge at any one location of 25 litres/second.
31. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
32. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to
Council.
Town Water Supply
33. The site shall be connected to Council’s existing town water supply and be constructed
in accordance with Council’s standards and requirements at no cost to Council.
34. Each water connection to the water reticulation system shall extend to the property
boundary and be metered. Where multiple units are served by a single service, multiple
water meters to each individual unit shall be installed. All fees for the supply of water
meters shall be paid to the Council.
Service Easements
35. A registered easement shall be created over the existing sewer main that crosses the
rear of the site. The easements shall generally be parallel to and centred over the sewer
main and be equivalent in width to twice the depth to invert level of the sewer at the
deepest point within the allotment (measured from the finished surface) and be no less
than 3.0 metres wide.
In this regard, plans submitted for Operational Works approval shall accurately show the
location of the easement.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at
the Land Titles Office and any additional Titles Office forms or requisitions requiring the
consent of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to
the use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
36. No building or other structure shall be constructed or encroach over an easement. Any
building or structure within proximity of an easement or any other public utility’s
underground must have its foundations designed so that no surcharge loads are
imposed upon such underground infrastructure. Foundations must be taken down a
minimum of 1 metre below a line of influence measured 1 metre in the direction of the
foundation from the centreline of the closest underground service and along the natural
angle of repose of the foundation soil type(s).
Page 5 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132003.221172.6 Change to Existing Approval Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 69 KB (small file)
- File type
No other editions are linked here.