132003.221172.6 Change to Existing Approval Notice · 132003.221172.7
Attached to the e-mail Changes form. owners consent, approved plans, copy of change approval - 132003.221172.7.
132003.221172.6
Plans, and supportive documents, detailing these proposed foundations shall be
designed by a registered practicing Geotechnical Engineer and submitted with the
application for a Development Permit for Operational Works.
Headworks
37. Contributions shall be paid to Council in accordance with Planning Scheme Policies
PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage
Headworks Contributions respectively and at the rates applicable at the time of payment.
An estimate only of the contribution rates as of June 2004 under the current policies is
as follows:
Water Supply $ 4,255
Sewerage $ 2,905
TOTAL $ 7,160
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should
the headworks contributions not be paid at the due time, Council shall call upon the
trading bank guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses
or is cancelled, the contribution or trading bank guarantee will be returned.
Earthworks
38. Earthworks required on site shall be carried out in accordance with Section 3.8 of
Council’s Engineering Design Standards Manual and so as not to cause the ponding of
water on any adjoining lands or the blockage of, or interference with any natural
watercourses.
39. Earthworks carried out on site shall not affect the structural integrity of any of the
existing fences that border the development site unless it is intended to replace such
fences. In this regard any fences to be replaced shall be clearly shown on the plans
submitted for Operational Works approval.
Erosion and Sediment Control
40. Any person acting on this permit shall prevent erosion and sediment export from leaving
the site. Site control measures such as silt fencing, controlled gravel access to the site
and controlled disposal of waste, will be necessary.
Plans detailing the methods of controlling erosion and sediment are required to be
submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General
41. Any damage caused to any public utility during the course of construction shall be
repaired to Council’s standards and at no cost to Council.
42. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council.
43. The transportation of all materials to and from the site shall be undertaken in a manner
such that no particle matter escapes onto a public road. All vehicles carrying materials
either to or from the site shall be covered to prevent materials including dust being
windblown from the vehicle.
Page 6 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132003.221172.6 Change to Existing Approval Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 69 KB (small file)
- File type
No other editions are linked here.