Original source · versioned page text
Compiled Plans & Documents OPW18-0342 02
Bushfire Emergency Provisions
Residential Aged Care Facility – 6 Grasstree Court, Sunrise Beach
Step 6 Staff Training and Awareness
In order to be appropriately prepared for a bushfire event, and to develop organisational situational
awareness of bushfire, a range of training and other awareness measures should be implemented
on an annual basis to ensure staff remain up-to-date on general matters of emergency
management (for the facility) and bushfire hazard. The following measures are recommended for
integration into the overall emergency plan for the facility:
• Adopt corporate systems and process which make it easy and routine for staff to check daily
fire weather forecasts during the fire season (August to March), and for staff to maintain
situational awareness. This may include centralised computer monitors with RFSQ, BOM and
the Council’s Disaster Dashboard pre-loaded and saved to favourites, including signage
around the office to prompt staff to routinely check fire danger ratings, and include
information at staff desks on the relevant websites to monitor. This could be expanded to
include similar information on signs at staff stations across the facility;
• Ensure each relevant staff member, upon commencement and then annually thereafter, is
made aware of their responsibilities and the process of the bushfire-specific monitoring and
evacuation provisions set out in this document, to be incorporated into the overall
emergency plan for the village;
• Consider the incorporation of annual ‘drills’ for the EPC and staff to practice, noting that
unnecessary evacuation of occupants is not desirable. However, alternative opportunities
to ‘war game’ potential evacuation procedures and running evacuation triage operations
as annual opportunities to practice could prove beneficial in building team confidence to
deal with emergencies. Subsequent to each practice, the EPC should undertake a review of
the process to understand those aspects which present challenges or did not work
effectively and implement relevant changes, to continually improve the system over time;
• Where emergency building evacuation signage is installed across the village, include or co-
locate emergency management information relating to off-site evacuation procedures.
Status: Provisions December 2018
Project No.: 18-030 Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Compiled Plans & Documents OPW18-0342 02.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.