Original source · versioned page text
Compiled Plans & Documents OPW18-0342 02
Provision should be made from
within the development water
supply system for fire hydrants
within proximity to the fire
track for emergency
firefighting use. This would be
included as part of the internal
hydraulics design for the site.
13.36 Vehicle access and fire trails
Firebreaks and fire access S9.1 Firebreaks are provided Complies
tracks by— The approved development
O9 Firebreaks or fire access a) a cleared road reserve not incorporated a series of APZs
tracks provide— less than 20m wide located
a) adequate access for fire around the perimeter of the which buffer approved
fighting and other emergency development; development from
vehicles; and OR surrounding vegetation. These
b) adequate width to minimise b) fire access tracks between APZs vary in width, from
the risk of fire crossover. the development and 13.5m to 30m, and are
surrounding vegetated
accessible by vehicle and fire
lands that—
i. are a minimum cleared width appliances. An easement could
of 6m; be provided to Council and
ii. have a maximum grade of 1 emergency services, noting the
in 8 (12.5%) ; specific conditions of the
iii. have a formed pavement; approval articulated that
iv. have access at each end reliance upon public fire trails
and in other locations where
necessary; was not acceptable in this
v. have passing areas and instance.
turning areas;
vi. have clearly identified
access points for emergency
vehicles; and
vii. are located on public land
or within access easements
that are granted in favour of
the Noosa Council and the
Queensland Fire and Rescue
Service.44
13.37 Reconfiguring a lot
This section is not applicable.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Compiled Plans & Documents OPW18-0342 02.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.