Irrespective of the above, the mitigation
methodologies identified by this report seek to
provide for increased resilience in addressing
matters such as built form, asset protection
zones, building and landscaping provisions,
property maintenance, access and egress and
evacuation.
The existing approval conditions require this
report including its attachments to be provided
to the local Fire Brigade for their information
purposes.
3. Directly, indirectly and cumulatively avoids A range of mitigation measures are
an increase in the severity of the natural recommended by this report to reduce the
hazard and the potential for damage on potential for bushfire impact, with the primary
the site or to other properties; and focus remaining on end-user safety.
4. Avoids risks to public safety and the Whilst the approved development does not
environment from the location of hazardous represent a hazardous facility, potentially
materials and the release of these materials flammable chemicals may be stored on site for
as a result of the natural hazard; and cleaning and other purposes. Any and all
chemicals must be stored indoors and ideally
within rooms which do not share an immediate
interface or have windows directly facing a
hazard source.
5. Maintains or enhances natural processes The approved development is subject to a
and the protective function of landforms range of vegetation management, ecological
and vegetation that can mitigate risks assessment and landscape concept plans
associated with the natural hazard which combined, seek to effectively balance
the natural features and processes associated
with the subject land and surrounding land, and
the required hazard mitigation approaches.
The measures and methodologies outlined in
this report remain cognisant of this strategic
balance noting the ecological value which
surrounds the land.
Additional SPP bushfire-related guidance material is anticipated to be released by the Department
of State Development, Manufacturing, Infrastructure and Planning in the near future however, as
this report relates to previously-approved development such forthcoming amendments to the SPP
are not relevant.
5.3 AS 3959 – Construction of Buildings in Bushfire Prone Areas
The AS3959 – Construction of Buildings in Bushfire Prone Areas specifies requirements and measures
for residential buildings constructed in bushfire prone areas. Bushfire attack levels (BALs), which form
the foundation upon which AS3959-2009 is applied, distinguish the level of attack buildings (and
occupants) may experience based on a range of factors which are analysed at Section 6 below.
A BAL is defined as ‘a means of measuring the severity of a buildings potential exposure to ember
attack, radiant heat and direct flame contact, using increments of radiant heat expressed in
kilowatts per metre squared, and the basis for establishing the requirements for construction to
improve protection of building elements from attack by bushfire’ (Standards Australia, 2011).
The level of attack buildings may experience is based on a range of factors including vegetation
typologies (fuel load), effective slope and separation distance, each of which has a significant
Status: Final March 2019
Project No.: 18-030 Page 23
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Compiled Plans & Documents OPW18-0342 02.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.