Original source · versioned page text
Compiled Plans & Documents OPW18-0342 02
Bushfire Constraint Assessment – Peer Review
BlueCare, Sunrise Beach
S7.1 Uses and works including Setbacks are to be equivalent to
O7 Uses and works including building works are sited— BAL-29.
building works are sited, a) on lots greater than 2500m 2;
designed and constructed i) in locations of lowest hazard within
to— the lot (Figure 13.5 provides
a) minimise the number of guidance); and
people and property subject ii) to achieve setbacks from
to bushfire risk; and hazardous vegetation of 1.5 times
b) maximise the protection of the predominant mature canopy tree
people and property during height or 10m whichever is the
the passage of a fire front. greater; and
iii) 10m from any retained vegetation
strips or small areas of vegetation;
and
iv) so that the elements of the
development least susceptible to fire
are sited closest to the bushfire
hazard;
b) on lots 2500m2 or less - to
maximise setbacks from hazardous
vegetation37
S8.1 For premises not in a water The site is in a water service
O8 An adequate and service area— each lot has an area.
accessible water supply is accessible dam, swimming pool or
provided for fire fighting water tank accessible by the fire
purposes. brigade that contains at least 5000
litres of water.
Firebreaks and fire access S9.1 Firebreaks are provided by— Firebreaks between the site and
tracks a) a cleared road reserve not less the bushfire threat include;
O9 Firebreaks or fire access than 20m wide located around the
To be included in final
tracks provide— perimeter of the development;
design
a) adequate access for fire
fighting and other emergency OR
vehicles; and b) fire access tracks between the
b) adequate width to development and surrounding
minimise the risk of fire vegetated lands that—
crossover. i. are a minimum cleared width of
6m;
ii. have a maximum grade of 1 in 8
(12.5%) ;
iii. have a formed pavement;
iv. have access at each end and in
other locations where necessary;
v. have passing areas and turning
areas;
vi. have clearly identified access
points for emergency vehicles; and
vii. are located on public land or
within access easements that are
granted in favour of the Sunshine
Coast Regional Council and the
Queensland Fire and Rescue
Service.41
General S10.1 The proposed lots are not
O10 The safety of people located on land that is subject to A site specific Bushfire
and property are maintained Medium or High Bushfire Hazard on Management Plan (BMP) will be
by overlay maps OM1.4-OM9.442; prepared demonstrating the
approved/ proposed development
a) Locating house site areas OR does not place people or property
and other sensitive uses on S10.2 The proposed lots are sited at an unacceptable risk from the
PR132938; Final / October 2016 Page 14
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Compiled Plans & Documents OPW18-0342 02.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.