Original source · versioned page text
6. Noosa River DMP Ver0 (Combined)
Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 28, section 1. The text section number identifies this passage in the reader.
5. Refueling to be undertaken at an approved facility or in calm waters with the vessel moored alongside a Contractor
suitable area under the supervision of the Engineer.
6. Oil spill management plan to be implemented. Management Plan to be located on board. Staff are to be Contractor
suitably trained. Suitable oil spill control stations to be located onboard.
7. Suitable amenities to be provided onshore. Contractor
8. Major repair and maintenance not to be undertaken on site. Contractor
Monitoring: Monitoring is to be undertaken in accordance with Table 4.
26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.