Performance outcomes Acceptable outcomes Response
Dredging
PO23 Capital dredging is to create or provide access No acceptable outcome is prescribed. PO23 NOT APPLICABLE
to public infrastructure.
Capital dredging is not proposed.
Note:
1. Privately owned marina facilities or maritime infrastructure
development that is open to the general public and facilitates
unrestricted public use for fishing purposes may be
considered public infrastructure
2. Dredging for access to private structures that do not provide
unrestricted public use is not supported.
PO24 Maintenance dredging is consistent with an No acceptable outcome is prescribed. PO24 NOT APPLICABLE
existing development approval for dredging; and
within approved profiles for navigational purposes. Maintenance dredging is not proposed.
PO25 Disposal of dredge spoil avoids adverse AO25.1 Dredge spoil is not deposited on tidal land. Will comply with PO25
impacts on marine plants.
Recommendations have been made in this report that
will enable adverse impacts to marine plants to be
avoided during the application of replenishment
material. This includes, not completely covering the
pneumatophores of mangroves and piling the
replenishment material outside of the tree protection
zones and allow natural processes to move the spoil.
Temporary works
PO26 Fish habitats and the fisheries resources they No acceptable outcome is prescribed. PO26 NOT APPLICABLE
support are restored to pre-existing or improved
condition and extent when the temporary works has Development will not require any temporary
ceased. structures.
PO27 Temporary works will be in place or are No acceptable outcome is prescribed. PO27 NOT APPLICABLE
undertaken for a specified period and for the shortest
possible time. Development will not require any temporary
structures.
PO28 A temporary structure is in place for a specified No acceptable outcome is prescribed. PO28 NOT APPLICABLE
period and is designed to be completely removed.
Development will not require any temporary
structures.
State Development Assessment Provisions – version 2.6
State code 11: Removal, destruction or damage of marine plants Page 10 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.