6. Noosa River DMP Ver0 (Combined)

of 392

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 385, section 1. The text section number identifies this passage in the reader.

  Performance outcomes                                                 Acceptable outcomes                                   Response
  Dredging
  PO23 Capital dredging is to create or provide access                 No acceptable outcome is prescribed.                  PO23 NOT APPLICABLE
  to public infrastructure.
                                                                                                                             Capital dredging is not proposed.
  Note:
  1. Privately owned marina facilities or maritime infrastructure
      development that is open to the general public and facilitates
      unrestricted public use for fishing purposes may be
      considered public infrastructure
  2. Dredging for access to private structures that do not provide
       unrestricted public use is not supported.

  PO24 Maintenance dredging is consistent with an                      No acceptable outcome is prescribed.                  PO24 NOT APPLICABLE
  existing development approval for dredging; and
  within approved profiles for navigational purposes.                                                                        Maintenance dredging is not proposed.

  PO25 Disposal of dredge spoil avoids adverse                         AO25.1 Dredge spoil is not deposited on tidal land.   Will comply with PO25
  impacts on marine plants.
                                                                                                                             Recommendations have been made in this report that
                                                                                                                             will enable adverse impacts to marine plants to be
                                                                                                                             avoided during the application of replenishment
                                                                                                                             material. This includes, not completely covering the
                                                                                                                             pneumatophores of mangroves and piling the
                                                                                                                             replenishment material outside of the tree protection
                                                                                                                             zones and allow natural processes to move the spoil.

  Temporary works
  PO26 Fish habitats and the fisheries resources they                  No acceptable outcome is prescribed.                  PO26 NOT APPLICABLE
  support are restored to pre-existing or improved
  condition and extent when the temporary works has                                                                          Development will not require any temporary
  ceased.                                                                                                                    structures.
  PO27 Temporary works will be in place or are                         No acceptable outcome is prescribed.                  PO27 NOT APPLICABLE
  undertaken for a specified period and for the shortest
  possible time.                                                                                                             Development will not require any temporary
                                                                                                                             structures.
  PO28 A temporary structure is in place for a specified               No acceptable outcome is prescribed.                  PO28 NOT APPLICABLE
  period and is designed to be completely removed.
                                                                                                                             Development will not require any temporary
                                                                                                                             structures.
State Development Assessment Provisions – version 2.6
State code 11: Removal, destruction or damage of marine plants                                                                                             Page 10 of 12
Log in to download the original file

6. Noosa River DMP Ver0 (Combined).pdf · 18.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.