Original source · versioned page text
6. Noosa River DMP Ver0 (Combined)
Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
LEADERSHIP
LEADERSHIP AND COMMITMENT
The Site-Specific Dredge Management Plan prepared by the Contractor shall demonstrate leadership and
commitment with respect to the environment management system, including evidence of a company environment
management policy and corresponding systems and procedures.
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.