Original source · versioned page text
6. Noosa River DMP Ver0 (Combined)
Very large file (18.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 96, section 1. The text section number identifies this passage in the reader.
Noosa River - Sediment Sampling Report
BMT (OFFICIAL)
The calculated net acidity was then compared to the National acid sulfate soils action criteria of 0.03%
S or 18 mol H+/tonne to assess the need for acid sulfate soil management if the dredged sediments
were to be placed on land. The liming rate indicates the amount of lime that needs to be added to the
sediment to manage its acid generating capacity.
A10342 | 005 | 01 19 14 April 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.