Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Activity Hazards Proposed Controls Responsible Person
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Residual
Planning for works Activity planning HIGH 5 Prior to the commencement of works that generate or agitate Respirable or Crystalline Silica Dust (RCS), an approved Site Management Contract
involving RCS and hazard SWMS with suitable controls is to be provided to the site team. Partner
identification HSE Advisor
Worker exposure HIGH 5 RCS work processes should be done outdoors away from other workers where possible. Site Management Contract
Partner
Indoors, separate the RCS work processes from other work activities where possible. HSE Advisor
Worker and visitor HIGH 4 Dedicated areas with barricades and signage are to be established where cutting, drilling, grinding, mixing and scraping Site Management Contract
exposure RCS is likely to be generated or agitated. Partner
These dedicated areas are to be:
- Segregated from other work areas & amenities.
- Mechanical ventilation and approved filtration
- With a bin near to dispose of waste
Worker Exposure HIGH 4 - Plan PPE as per MPF requirements identified in RCS COP.
Project Hazard/Risk Assessment / Page 50 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.