Skip to the record
The gold standard in government transparency.

Council archive · source document

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 80

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

      Activity            Hazards                                                                                 Proposed Controls                                                                         Responsible Person




                                           Risk
                                                                                                                                                                                                Risk




                                                        HOC




                                          Initial
                                          Rating
                                                                                      (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)




                                                                                                                                                                                              Residual
Planning for works   Activity planning    HIGH          5     Prior to the commencement of works that generate or agitate Respirable or Crystalline Silica Dust (RCS), an approved                       Site Management Contract
involving RCS        and hazard                               SWMS with suitable controls is to be provided to the site team.                                                                            Partner
                     identification                                                                                                                                                                      HSE Advisor

                     Worker exposure      HIGH          5     RCS work processes should be done outdoors away from other workers where possible.                                                         Site Management Contract
                                                                                                                                                                                                         Partner
                                                              Indoors, separate the RCS work processes from other work activities where possible.                                                        HSE Advisor
                     Worker and visitor   HIGH          4     Dedicated areas with barricades and signage are to be established where cutting, drilling, grinding, mixing and scraping                   Site Management Contract
                     exposure                                 RCS is likely to be generated or agitated.                                                                                                 Partner
                                                              These dedicated areas are to be:
                                                              - Segregated from other work areas & amenities.
                                                              - Mechanical ventilation and approved filtration
                                                              - With a bin near to dispose of waste
                     Worker Exposure      HIGH      4         - Plan PPE as per MPF requirements identified in RCS COP.




                                                                                                                                                      Project Hazard/Risk Assessment / Page 50 of 160

Used in these records

About this file

File size
836 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 836 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.