Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Activity Hazards Proposed Controls Responsible Person
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Residual
Drilling, grinding, Worker and visitor HIGH 3 Where practical an engineered control is to be implemented to reduce or eliminate as far as reasonably practicable Site Management Contract
grinding, mixing, exposure RCS dust exposure to the acceptable national exposure limit. These controls include: Partner
scraping of RCS - Extraction / vacuums
materials
- Tool attachments (shrouds / drill pieces etc.)
- Misting / water application
- Prefabrication / modifications off site
- Cast in components or block outs to reduce agitation of RCS.
- Accurate site measures to eliminate the requirement for cuts or alterations.
Worker exposure EXTREME 6 Those personnel involved in cutting, drilling, grinding, mixing, scraping where an exposure to dust exists must wear Site Management Contract
to RCS suitable Respiratory Protective Equipment for the task and receive adequate training in its use and application. Partner
Worker exposure EXTREME 2 Alternative materials with no or reduce silica amounts to be used. Site Management Contract
to RCS Partner
General cleaning Worker and visitor EXTREME General Cleaning activities that may expose a worker to RCS Avoid blowing, areas: Site Management Contract
exposure Partner
- suitable vacuum / extraction method to be utilised where practical.
- dust to be bagged in vacuum cleaner.
- When emptying vacuum ensure contents are not emptied from the bag directly into the bin
- Misting/water application when emptying site bins.
NOTE – suitable Respiratory Protective Equipment is still required to be worn when vacuuming.
- If vacuum is not practical, then another means of dust suppression (e.g. water) is to be applied to the area.
- Dust cleaned up and stockpiled for removal is to be enclosed in sealed plastic prior to placing in bin
RCS levels EXTREME 5 The workplace exposure limit shall be in accordance with the national exposure guidelines for RCS. Site Management Contract
exceeding national Partner
exposure
guidelines
Worker exposure EXTREME 5 General Dust management refer to Environmental Management Plan Site Management Contract
to RCS Partner
- Prior to overturning bins to empty, apply a light mist over the contents to reduce the risk of agitation.
- No bins are to be overturned in enclosed areas
Health monitoring Health impacts EXTREME 5 Where Woollam direct employees are undertaking activities exposing them to hazardous substances health Site Management Contract
surveillance / monitoring as required by relevant legislation will be undertaken, or those identified as significant risk to Partner
a worker’s health through the Hazardous Substance Risk Assessment. Procedure is outlined in the Woollam Health HSE Advisor with
Monitoring Program. BSBWHS414 OHS Cert 4
Occupation Hygienist.
Project Hazard/Risk Assessment / Page 51 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.