Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
10. Fire Protection on Site
Proposed Controls Responsible
Activity Hazards
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Residual
Planning Safe evacuation path MEDIUM 3 Fire Emergency Exits / evacuations ways: Site
Management
- to be assessed to be clear of operational activities that could have a major impact on safe movement of
workers.
- be a minimum of 1200mm wide.
- be the quickest route to identified exit internal stairs and scaffold stairs.
- be uncluttered and kept clear for the entire route to the exit stairs and down to the building exit.
- be uncluttered from the building exit to the assembly areas.
- have adequate lighting to ensure safe visual travel – refer Lighting section to be maintained on a daily
basis and assessed on the Weekly HSE Inspection on Procore
Incorrect signage MEDIUM 3 Fire Emergency Exit / Access Signage Site
Management
- “Exit” signs to be positioned at all exit points from floor levels to exit stairs.
- “Evacuation Route” signs to be positioned along areas where Exit Signs can’t be quickly identified due to
building structure changes.
- exit signs to be positioned at a height of 2m and at various locations along the access way to adequately
inform workers of the safe exit route to take.
- be positioned at a height minimum of 2m above the floor adjacent to the exit openings.
be illuminated adjacent to internal stair wells – refer Lighting section to be maintained on a daily basis and
assessed on Weekly HSE Inspection on Procore
Fire control equipment MEDIUM 4 Fire Extinguisher: Site
Management
- Not less than one fire extinguisher to suit Class A, B and C fires and fires involving electrical equipment
will be always provided on each storey adjacent to each required exit or temporary stair or exit.
- Fire extinguishers to be installed with mounting bracket, (1200mm above floor level) and signage (2m
above floor) to prevent possible dislodgement and damage.
- to be maintained daily and assessed on Weekly Inspection Checklist
- To be tested and tagged at intervals not exceeding 6 months
Construction phase Fire control equipment MEDIUM 4 After the building has reached an effective height of 12m: Site
Management
- The required hydrants and hose reels for the building will be operational in at least every storey that is
covered by the roof or the floor structure above, except the 2 uppermost storeys: and
- Any required booster connections are to be installed.
- Hose reels are to be always rolled onto drum.
- The area in front of all hose reels is to be kept clear and uncluttered.
Project Hazard/Risk Assessment / Page 65 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.