Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls Responsible
Activity Hazards
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Residual
Review and Safety Interactions, Task Observations, Weekly HSE Inspection, Monthly Audit as per Procore Inspection matrix
Monitoring
9.5Commissioning and energisation works
Planning for Electrocution EXTREME 5 Planning of works to be conducted with the site team and Contract Partner’s to apply for Permit to Energise Project Team
energisation works Contract Partner
Site disruptions Permit to identify any site impacts and communication requirements to the remainder of the project.
Inadvertent livening of parts Permit to energise will ensure communication and consultation with all involved trades and the Project Team.
Planning for Electrocution EXTREME 5 Commissioning process is to be coordinated with the site management team in alignment with AS 3760. Site Management
commissioning Electrical Contractor
Site disruptions
works
Inadvertent livening of parts
Commissioning Electrocution EXTREME 3 Tools, testing equipment and PPE are to be suitable for the task and align with the Safe Work Method Statement and Electrical Contractor
AS/NZS 3760
Electrocution EXTREME 5 Emergency Plan (for commissioning and energisation / electrocution) to be supplied by the Contract Partner prior to Electrical Contractor
works commencing (may be contained in the SWMS).
Works on Electrocution EXTREME 6 LV rescue kit to be on standby during commissioning works on/in switchboards. Electrical Contractor
switchboards
Completion of Inadvertent energisation of EXTREME 5 Licenced electrical to provide commissioning / testing records following completion of energisation works to verify Electrical Contractor
commissioning or electrical equipment and compliant electrical work has been handed over and is compliant and is carried out in accordance with AS 3000 and the
energisation works circuits applicable Australian standard.
Workers electrocuted / EXTREME 5 Where distribution boards are decommissioned, and GPOs are utilised during the handover stage of a project the Site Manager
shocked electrical contractor is to provide a test and compliance certificate and clearly communicate those circuits that are Contract Partner
operational off the mains board. Emergency shutdown processes for the board are to be briefed with the site
management team.
References AS 3760 Inservice safety, inspection, and testing of electrical equipment.
AS/NZS 3012 Electrical Installations – Construction
Review and Safety Interactions, Task Observations, Weekly HSE Inspection, Monthly Audit as per Procore Inspection matrix
Monitoring
Project Hazard/Risk Assessment / Page 64 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.