Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
11.Demolition
Proposed Controls Responsible
Activity Hazards
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Residual
Planning for Collapse of structures EXTREME 5 Woollam’ Demolition Work of Structures Checklist is to be completed prior to work starting. Site
demolition works / buildings Management
Demolition
Contract Partner
Compliance with EXTREME 5 The regulator is required to be notified of the following types of demolition work 5 business days prior to the commencement Project
regulatory of work: Management
requirements Site
- of a structure or part of a structure that is load bearing or otherwise related to the physical integrity of the structure Management
(only if six metres or higher in height) Demolition
- involving load shifting machinery on a suspended floor Contract Partner
- involving explosives
- Copies of notifications and permits will be obtained and retained on file
Exposure to hazardous EXTREME 5 Asbestos report from client or an appropriately qualified person who has examined the building or structure for the presence Project
materials of asbestos. Management
Site
Management
Exposure to hazardous EXTREME 1 All hazardous substances, lead and asbestos will be removed prior to demolition. Site
materials Management
Asbestos / Lead
Removalist
Compliance with EXTREME 5 Copies of business certificate for demolition and where applicable asbestos removal certificates for the Contract Partner will Site
regulatory be obtained. Management
requirements Demolition
Contract Partner
Inadequate EXTREME 5 Name and details of competent person to supervise demolition activities are to be obtained. Site
supervision Management
Contract Partner
Collapse of structures EXTREME 5 A Demolition Work Plan which considers the requirements of AS 2601 The demolition of structures and the relevant state Demolition
/ buildings code of practice will be provided for all demolition activities including: Contract Partner
Injury to workers a) location of the site on which the structure to be demolished stands
b) The overall height of the structure above ground level and the least distance from the structure to each boundary (all to
nearest 0.5m)
c) A brief description of the type of building (occupancy class), its structural support system and principal materials of
construction.
Project Hazard/Risk Assessment / Page 68 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.