Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls Responsible
Activity Hazards
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Residual
d) Brief description of the methods of demolition proposed (including type of major equipment required and method of
moving between floors)
e) Methods for handling and disposing of demolition materials including hazardous waste.
f) Sequence of activities with the expected time to complete (in days) each stage of work.
g) Details of protective measures
h) Exclusion zones
i) And other plans related to items d) and g) including temporary engineering requirements.
j) Traffic management plan requirements
k) all relevant SWMS.
l) Noise, dust and environmental controls are to be identified and documented.
The Demolition Work Plan will include details of results of investigations as required by AS 2601 The demolition of structures
Demolition Collapse of structures EXTREME 5 If mechanical means are used to carry out the demolition work, the work is to be carried out sequentially in accordance with Site
activities / buildings approved Demolition Work Plan. Management
Demolition
Contract Partner
Collapse of structures EXTREME 5 Demolition work involving pulling with ropes or chains or similar means will only be carried out if the building being Demolition
/ buildings demolished is not more than 4 metres in height and the work is carried out sequentially. Contract Partner
Collapse of structures EXTREME 5 The demolition of chimney stacks will be in accordance with the relevant state legislation. Demolition
/ buildings Contract Partner
Collapse of structures EXTREME 3 Persons will not be permitted to work in or below a building being demolished Site
/ buildings Management
Demolition
Contract Partner
Collapse of EXTREME 5 Engineer’s investigation and certificate to support demolition machinery on structure. Site
structures/buildings Management
Demolition
Contract Partner
Exposure to hazardous EXTREME 5 Where demolition is performed by Woollam, and asbestos is identified on site work is to cease immediately (refer to Site
materials Hazardous Materials, Substances or Chemicals section) Management
Demolition
Contract Partner
Exposure to live EXTREME 5 Details (prescribed information) about underground services are recorded in writing and given to each person who is to do Site
services (gas, demolition work. Management
electrical, sewerage,
refrigerant gases etc.)
Project Hazard/Risk Assessment / Page 69 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.