Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 80

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                                   Proposed Controls                                                                          Responsible
    Activity          Hazards




                                            Risk
                                                                                                                                                                                                   Risk




                                                     HOC




                                           Initial
                                           Rating
                                                                                      (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                                           Person



                                                                                                                                                                                                 Residual
                                                           d) Brief description of the methods of demolition proposed (including type of major equipment required and method of
                                                                moving between floors)
                                                           e) Methods for handling and disposing of demolition materials including hazardous waste.
                                                           f)   Sequence of activities with the expected time to complete (in days) each stage of work.
                                                           g)   Details of protective measures
                                                           h) Exclusion zones
                                                           i)   And other plans related to items d) and g) including temporary engineering requirements.
                                                           j)   Traffic management plan requirements
                                                           k) all relevant SWMS.
                                                           l)   Noise, dust and environmental controls are to be identified and documented.
                                                           The Demolition Work Plan will include details of results of investigations as required by AS 2601 The demolition of structures

Demolition     Collapse of structures    EXTREME     5     If mechanical means are used to carry out the demolition work, the work is to be carried out sequentially in accordance with                           Site
activities     / buildings                                 approved Demolition Work Plan.                                                                                                                    Management
                                                                                                                                                                                                              Demolition
                                                                                                                                                                                                            Contract Partner
               Collapse of structures    EXTREME     5     Demolition work involving pulling with ropes or chains or similar means will only be carried out if the building being                             Demolition
               / buildings                                 demolished is not more than 4 metres in height and the work is carried out sequentially.                                                         Contract Partner

               Collapse of structures    EXTREME     5     The demolition of chimney stacks will be in accordance with the relevant state legislation.                                                        Demolition
               / buildings                                                                                                                                                                                  Contract Partner

               Collapse of structures    EXTREME     3     Persons will not be permitted to work in or below a building being demolished                                                                          Site
               / buildings                                                                                                                                                                                   Management
                                                                                                                                                                                                              Demolition
                                                                                                                                                                                                            Contract Partner
               Collapse of               EXTREME     5     Engineer’s investigation and certificate to support demolition machinery on structure.                                                                 Site
               structures/buildings                                                                                                                                                                          Management
                                                                                                                                                                                                              Demolition
                                                                                                                                                                                                            Contract Partner
               Exposure to hazardous     EXTREME     5     Where demolition is performed by Woollam, and asbestos is identified on site work is to cease immediately (refer to                                    Site
               materials                                   Hazardous Materials, Substances or Chemicals section)                                                                                             Management
                                                                                                                                                                                                              Demolition
                                                                                                                                                                                                            Contract Partner
               Exposure to live          EXTREME     5     Details (prescribed information) about underground services are recorded in writing and given to each person who is to do                              Site
               services (gas,                              demolition work.                                                                                                                                  Management
               electrical, sewerage,
               refrigerant gases etc.)


                                                                                                                                               Project Hazard/Risk Assessment / Page 69 of 160

Used in these records

About this file

File size
836 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 836 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.