Council archive · source document
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
16. Temporary Support Structures
Proposed Controls Responsible
Activity Hazards
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Residual Person
16.1 Formwork
Planning Collapse of EXTREME 5 Formwork / Concrete Placement and Installation Checklist on Procore is to be completed prior to commencement of formwork and Site
formwork concrete placement. Management
Contract
Partner
Collapse of EXTREME 5 Formwork documentation will be provided prior to work being undertaken and available on site. This documentation shall contain a Site
formwork statement that the formwork design conforms with AS 3610 including the following information: Management
Formwork
a. A certification letter from the Professional Engineer or Formwork Designer listing the formwork drawings or all drawings signed and Contract
certified by the engineer or formwork designer. Partner
b. Formwork drawings
c. Where eccentric loading is to be applied to U-heads (i.e. single bearers are positioned to one side of the U-head), the formwork drawings
should state that this is permitted.
d. Details sufficient to fully describe important or unusual features of the design.
e. Reference to documentation for proprietary items.
f. Work method statements for the erection and stripping of the formwork assembly.
g. The areas of the form designed to carry stacked loads.
h. Acceptance criteria for single use formwork.
i. Requirements for the project documentation relating to formwork.
j. Method of provision for field adjustment of the forms prior to and during concrete placement.
k. Where required, location of weep holes, vibrator holes, clean-out holes and inspection openings.
l. Sequence of concrete placement, including direction of intended pour on ranking or sloping surfaces.
m. Wrecking strips and other details relating to stripping of other forms.
n. Design assumptions, including those related to strength, stability and stiffness.
o. Footing design assumptions, such as foundation material description, safe bearing value, limitations on settlement during erection of
formwork, placement of concrete and dismantling of formwork. Reference to information sources such as geotechnical reports should
also be included.
p. Preparation of the foundation, such as filling, compaction, and drainage.
q. Footing details, such as type and size of footings, level of soffit, concrete strength, reinforcement, specification and details of site filling
or compaction, and precautions against washouts.
Project Hazard/Risk Assessment / Page 109 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.