Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls Responsible
Activity Hazards
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Residual
r. Professional engineer certification of non-proprietary equipment.
s. Evidence that the formally conforms to Australian Standards.
t. Vertical pour rates.
u. Methods of securing single or multiple props
Collapse of EXTREME 5 Formwork drawings must explain: Formwork
formwork Contract
- Plans, elevations, and sections to show the general arrangement of the formwork and to identify and locate all members and Partner/
components including bracing. Engineer
- Wall and column form details
- The maximum point loadings to be applied.
- The component types and spacings.
- The maximum jack extensions.
- The bearer and joint timber type, the dimensions and spacings.
- The prop sizes and maximum extensions.
- The method for tying the structure together and spacing between ties (if required); and
- The form ply size
Collapse or EXTREME 5 Formwork must be designed by a competent person or an RPEQ certified engineer as per the table below referenced from the Formwork
Formwork COP 2016.
Project Hazard/Risk Assessment / Page 110 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.