                                                                                                                    Proposed Controls                                                                             Responsible
  Activity       Hazards




                                   Risk
                                                                                                                                                                                                         Risk




                                            HOC




                                  Initial
                                  Rating
                                                                                       (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                                              Person


                                                                                                                                                                                                       Residual
             injury to other                      d. Specification of appropriate manual handling methods for shutters and other components; and
             trades
                                                  e. Provision for retrieval of an injured person
             slips and trips

             Workers not        EXTREME     5     A person must hold a scaffolder’s licence if they are undertaking scaffolding work which involves erecting, altering or dismantling a                              Site
             trained /                            temporary structure that is or has been erected to support a platform from which a person or thing may fall more than four metres.                              Management
             licenced in the                                                                                                                                                                                       Contract
             activity                                                                                                                                                                                               Partner

             Workers not        EXTREME     5     Formwork erection where a person could fall 4 metres or more will not be undertaken by a person unless they hold a certificate of                                  Site
             trained /                            competency as a “scaffolder.”                                                                                                                                   Management
             licenced in the                                                                                                                                                                                       Contract
             activity                                                                                                                                                                                               Partner

             Workers not        EXTREME     5     Where required by state legislation formwork erection tasks will only be undertaken by those persons with the appropriate certificate of                           Site
             trained /                            competency. Evidence of this certificate will be provided to Woollam (sighted and copied at induction).                                                         Management
             licenced in the                                                                                                                                                                                       Contract
             activity                                                                                                                                                                                               Partner

             Fall from          EXTREME     5     Barricades and warning signs will be erected to exclude unauthorised persons from the formwork area.                                                               Site
             height.                                                                                                                                                                                              Management
                                                                                                                                                                                                                   Contract
             Falling objects                                                                                                                                                                                        Partner
             Collapse of        EXTREME     4     The formwork will be designed and erected to ensure it provides adequate support for the placement and movement of coils of strand and                             Site
             formwork                             other equipment & materials required.                                                                                                                           Management
             Fall from height                                                                                                                                                                                      Engineer

             Collapse of        EXTREME     5     Formwork deck handover form to be completed prior to loading formwork deck and other trades working on the formwork deck.                                          Site
             formwork                                                                                                                                                                                             Management
             Fall from height                                                                                                                                                                                      Contract
                                                                                                                                                                                                                    Partner
             Collapse of        EXTREME     5     Exclusion zones below formwork decks during concrete pour.                                                                                                         Site
             formwork                                                                                                                                                                                             Management
             Fall from height                                                                                                                                                                                      Contract
                                                                                                                                                                                                                    Partner
                                                                                                                                                                                                                   Engineer
             Dust               EXTREME     5     Cleaning of all form ply is to occur with suitable dust mitigating controls – refer to Respirable Crystalline Silica section.                                    Contract
                                                                                                                                                                                                                    Partner
Stripping    Collapse of        EXTREME     5     Prior to stripping of any formwork, the Second Part of the Formwork / Concrete Placement and Installation Checklist (for that specific slab)                        Site
formwork     formwork                             will be completed, and the following will occur:                                                                                                                Management
                                                                                                                                                                                                                   Contract
                                                  a. Back propping details, drawings and design by a professional engineer is to be available on site and made available to the form worker.                        Partner
                                                  b. Specifications are to be available on site for the concrete strength and when the formwork can be removed.


                                                                                                                                                    Project Hazard/Risk Assessment / Page 113 of 160

Used in these records

About this file

File size
836 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 836 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.