Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls Responsible
Activity Hazards
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Residual
injury to other d. Specification of appropriate manual handling methods for shutters and other components; and
trades
e. Provision for retrieval of an injured person
slips and trips
Workers not EXTREME 5 A person must hold a scaffolder’s licence if they are undertaking scaffolding work which involves erecting, altering or dismantling a Site
trained / temporary structure that is or has been erected to support a platform from which a person or thing may fall more than four metres. Management
licenced in the Contract
activity Partner
Workers not EXTREME 5 Formwork erection where a person could fall 4 metres or more will not be undertaken by a person unless they hold a certificate of Site
trained / competency as a “scaffolder.” Management
licenced in the Contract
activity Partner
Workers not EXTREME 5 Where required by state legislation formwork erection tasks will only be undertaken by those persons with the appropriate certificate of Site
trained / competency. Evidence of this certificate will be provided to Woollam (sighted and copied at induction). Management
licenced in the Contract
activity Partner
Fall from EXTREME 5 Barricades and warning signs will be erected to exclude unauthorised persons from the formwork area. Site
height. Management
Contract
Falling objects Partner
Collapse of EXTREME 4 The formwork will be designed and erected to ensure it provides adequate support for the placement and movement of coils of strand and Site
formwork other equipment & materials required. Management
Fall from height Engineer
Collapse of EXTREME 5 Formwork deck handover form to be completed prior to loading formwork deck and other trades working on the formwork deck. Site
formwork Management
Fall from height Contract
Partner
Collapse of EXTREME 5 Exclusion zones below formwork decks during concrete pour. Site
formwork Management
Fall from height Contract
Partner
Engineer
Dust EXTREME 5 Cleaning of all form ply is to occur with suitable dust mitigating controls – refer to Respirable Crystalline Silica section. Contract
Partner
Stripping Collapse of EXTREME 5 Prior to stripping of any formwork, the Second Part of the Formwork / Concrete Placement and Installation Checklist (for that specific slab) Site
formwork formwork will be completed, and the following will occur: Management
Contract
a. Back propping details, drawings and design by a professional engineer is to be available on site and made available to the form worker. Partner
b. Specifications are to be available on site for the concrete strength and when the formwork can be removed.
Project Hazard/Risk Assessment / Page 113 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗