                                                                                                                 Proposed Controls
       Activity           Risk                                                                                                                                                                            Responsible Person




                                           Risk
                                                                                                                                                                                               Risk




                                                        HOC




                                          Initial
                                          Rating
                                                                                      (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)




                                                                                                                                                                                             Residual
                  Activity planning      HIGH       5         All tasks involving concrete pumping will have an approved SWMS in place including prior to the commencement of                           Site Management
                  and hazard                                  work.
                  identification                                                                                                                                                                        Contract Partner


                  Impact of pipelines    HIGH       3         When the pump be set up in the street, then safe and unobstructed access for the public-to-public areas in the vicinity                   Site Management
                  and boom with                               of the pumping unit and the delivery trucks will be maintained and clearly identified. Controls to protect the public
                  structure, scaffold,                        from concrete pumping activities will be implemented:
                  and personnel
                                                              Protective screens fitted around the pump area.
                                                              Close fitting mesh or shade cloth screen around the pump reservoir
                                                              Sign posting “concrete pump being used” / “Concrete pump in operation”.
                                                              Provide an access ramp for the public which is stable and sold, doesn’t create a trip hazard, has a height to length ratio
                                                              of no more than 1:12 from the highest point to the end of the ramp, is easily negotiable by wheelchair, has a non-slip
                                                              surface at all times, extends the width of the footpath, has handrails and toe boards, has adequate lighting and has
                                                              pump pipes that are removable for inspection and cleaning.

Pump set up       Overhead services      HIGH       5         The boom pumps will be set up with regard to the minimum distance requirements to power lines, wind conditions                            Site Management
                  and obstacles                               and the presumption that all power lines etc. are live unless they are positively identified to be isolated, and a
                                                              certificate has been issued stating the same.

                  Rollover of concrete   HIGH       5         Underground services, unstable ground, and other excavations in the vicinity will be identified and details given to the                  Site Management
                  truck                                       Contract Partner prior to setup and commencement of work.

                  Other workers or       HIGH       5         Concrete pump areas will be sign posted “Danger – Concrete Pumping Area – Authorised Persons Only”.                                       Site Management
                  visitors in the
                  concrete pumping                            Exclusion zone established and unauthorised people are not present in concrete pumping exclusion zone.
                  zone                                        All persons other than operators of the pump are to stay clear of the pump and associated pipes / accessories.

                  Exposure to fumes      HIGH       5         Precautions will be taken to prevent the build-up of exhaust gases in work areas.                                                         Site Management
                  from exhaust
                                                                                                                                                                                                        Contract Partner

                  Slips, trips and       HIGH       5         Clear access to the pump unit for concrete trucks to be maintained.                                                                       Site Management
                  injury to pump
                  operators




                                                                                                                                               Project Hazard/Risk Assessment / Page 116 of 160

Used in these records

About this file

File size
836 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 836 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.