Council archive · source document
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls
Activity Risk Responsible Person
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Residual
Access maintained HIGH 3 For permanent / semi-permanent set up areas for the concrete pump, lines will be painted (or similar) to define the Site Management
to the concrete area and clear access allowed to the area and adequate lighting provided.
pump (static)
Structural or HIGH 5 Pipe wall thickness should be tested in accordance with AS 2550.15 as below: Site Management
mechanical failure
(i.e.): Single wall pipe shall be tested monthly to ensure it does not exceed minimum thickness. Thickness of wall to be Contract Partner
recorded in logbook.
Pipeline
Ultrasonic testing may not be appropriate for a twin wall pipeline. A documented system to reduce the risk of pipeline
Gauges failure should be implemented for any pipe. Other suitable testing methods should be adopted such as the use of
thickness testing callipers, internal inspection, and increased monitoring of use, in terms of volume and type of
Anchor brackets. concrete pumped.
Pipe clamps. Piping with a wall thickness less than the recommended thickness for the pumping design pressure should not be
Pipe movement placed out of service.
All pipeline segments (i.e.: pipe, bend, reducer, etc.) shall be clearly identified with a permanently fixed unique
identification mark or number (which is recorded in the logbook), prior to being placed in service, showing the details
required in accordance with AS 2550.15 Cranes, hoists and winches – Safe use – Concrete placing equipment. Where a
segment cannot be readily identified via a unique identification mark or number that segment will be removed from
service.
Deficient or faulty EXTREME 5 Inspection, maintenance, and test records for: Contract Partner
pump and
equipment Daily before commencement of work,
Weekly,
Monthly,
annual inspections and
6 yearly major (strip down) inspections shall be on the plant.
Concrete pipe EXTREME 4 All lever or snap type clips will be fitted with safety pins. Pipe clamps that do not use locking pins will not be used Contract Partner
clamp failure onsite.
Entanglement in HIGH 3 Hopper grates will be in place whenever the pump is operating. Site Management
moving parts
Contract Partner
Entanglement in HIGH 5 Persons must not stand on or place hands or any other body part into the hopper at any time. Site Management
moving parts
Project Hazard/Risk Assessment / Page 117 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.