Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls
Activity Risk Responsible Person
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Residual
Fall from height EXTREME 4 Compliant edge protection consisting of handrail at 900mm, mid-rail at 450mm and toe board 150 to 250mm must be Site Management
in place for work 2m and above or via risk assessment if under 2m.
Contract Partner
A 2m exclusion zone to be established during works
Falling objects EXTREME 4 Mesh guard to be installed if risk of falling objects could occur. Safe access to working platform must be in place Site Management
Contract Partner
Plant colliding with EXTREME 3 Plant movement paths and exclusion zones are to be established on and around walls that have been braced. Site Management
temporary bracing
Contract Partner
Hazardous EXTREME 6 Mixing of cement should be done in well-ventilated area. Required PPE to be worn as per SDS (i.e., eye and hand Site Management
substances protection).
Contract Partner
Hazardous EXTREME 5 Controls are to be implemented so workers are not exposed to RCS above the workplace exposure limit. Site Management
substances
Contract Partner
Manual handling EXTREME 4 High risk manual tasks to be identified e.g., continuous heavy lifting, excessive pulling/ pushing movements – controls Site Management
injuries implemented for high-risk manual tasks e.g., use trolleys to lift blocks from pallet, not pushing/ pulling loaded pallets
onto or off of loading platforms, materials and tools not to be thrown from one level to another. Mechanical or other Contract Partner
means to be used as required
Hazardous EXTREME 5 Workers trained in hazardous substance use (hydrochloric acid). Hazardous chemicals safely stored when not in use; Site Management
substances Hazardous chemicals not stored in drink containers
Contract Partner
Falling objects EXTREME 5 Loading of blocks on scaffolds bays or working decks not to overload SWL of the scaffold bay. Site Management
Scaffold collapse Contract Partner
Bracing and propping Wall collapse EXTREME 4 Wind loadings must also be considered when determining bracing requirements and wall heights. Bracing to be Site Management
installed on both sides of masonry walls unless appropriate push/pull bracing is installed.
Contract Partner
Injury EXTREME 4 Exclusion and No-Go zones to be established around all walls when high winds are expected. Site Management
Contract Partner
Project Hazard/Risk Assessment / Page 124 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.