Council archive · source document
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls Responsible
Person
HC
Activity Hazard
Risk
Risk
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Residual
operator not
available EXTREME 3 A person trained and qualified for the model and type of EWP shall be readily available and fit for work. Contract Partner
Rescue EWP EXTREME 3 All EWPs on the project shall be inspected prior to each daily use and the inspection recorded in the logbook. Any item of plant Contract Partner
defective, found to be defective, faulty, or damaged shall be removed from service and Site Manager to arrange a replacement or repair in an
faulty, or appropriate timeframe.
damaged
Site
EXTREME 5 No work activity that has workers in a fall arrest / restraint system shall be performed if there is no operational EWP capable for a Management
rescue or qualified operator available.
Contract Partner
Site
List activities in Workers HIGH 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Management
procedure e.g. unfamiliar with Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact
Evacuation to emergency details. Contract Partner
route, isolate procedures and
specific hazard, processes
prevent spread
of contaminants
where possible
19.2 Asbestos Containing Material Discovery / Exposure
Site
Planning for the Activity HIGH 5 Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO. Management
discovery of planning,
suspected hazard
Asbestos identification,
Containing resourcing, and Site
HIGH 5 Project specific Emergency Preparedness and Response Plan completed prior to work commencing on the project. Management
Material. implementation
of controls
Site
HIGH 5 Client / Building Owner shall provide a copy for the Asbestos Register Management
Site
Use of Specific Discovery of or EXTREME 4 Work to cease and an exclusion zone established with safety signage Management
Equipment exposure to
suspect Contract Partner
material
Project Hazard/Risk Assessment / Page 131 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.