Council archive · source document
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
19. Emergency Response Scenarios
Proposed Controls Responsible
Person
HC
Activity Hazard
Risk
Risk
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Residual
19.1 Arrested Fall in a Harness
Site
Planning for an Activity HIGH 5 Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO. Management
arrested fall in planning,
harness rescue. hazard
identification,
resourcing, and Site
HIGH 5 Project specific Emergency Preparedness and Response Plan completed prior to work commencing on the project. Management
implementation
of controls
Site
HIGH 5 Work at Heights Permit completed, reviewed, and authorised prior to the work activity commencing. Management
Contract Partner
HIGH 5 The SWMS submitted by the Contract Partner shall outline their rescue procedure for this activity and their workers have been Contract Partner
trained to perform a rescue
HIGH 5 Workers involved in the rescue can provide evidence of a current Safe Work at Heights qualification - RIIWHS204E - Work safely at Contract Partner
heights
Site
Use of Specific Rescue EXTREME 3 Rescue equipment items identified in the Emergency Preparedness and Response Plan are readily available and in serviceable Management
Equipment equipment - condition.
Fall arrest /
restraint
system items EXTREME 3 The worker to use the fall arrest / restraint equipment shall inspect each item prior to commencing the activity. Any item found to Contract Partner
defective, be defective, faulty, or damaged shall be immediately removed form service.
faulty, or
damaged.
EXTREME 3 Each item of fall arrest / restraint equipment shall be inspected every 6 months by a Rigger or qualified height safety inspector. Contract Partner
Items that exceed the life span of 10 years from date of manufacture shall be removed from service and destroyed.
Site
Rescue EWP not EXTREME 3 An EWP with the applicable height capacity shall be readily available. Management
available and /
or licensed Contract Partner
Project Hazard/Risk Assessment / Page 130 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.