DEVELOPMENT ASSESSMENT DELEGATED REPORT
Community Management Statement
24. Any proposed Community Management Statement required for the development pursuant to
the Body Corporate and Community Management Act 1997 must be submitted to Council for
endorsement at the same time as submission of the Building Format Plan (or similar) to
Council for compliance assessment.
25. All clauses and by-laws of the proposed Community Management Statement must accord
with the requirements of this Decision Notice.
ENGINEERING
External Works
26. Bottlebrush Avenue must be upgraded for the length of its frontage to the subject site. The
must include in particular:
a. construction of the kerb and channelling and on-street parking generally as shown on
drawing number C40 revision D prepared by Recor dated 15 March 2023
b. removal of the existing timber retaining wall in the road reserve
c. extension of the kerb and channel to a point 1m past the proposed stormwater outlet
in Bottlebrush Avenue
Condition 26 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
27. The existing crossover and driveway in Berrima Row must be wholly removed and the kerb
and channel reinstated as part of the development works.
Site Access and Driveways
28. A sealed access driveway must be provided from Bottlebrush Avenue to all parking and
manoeuvring areas of the development. The works must be generally as shown on drawing
number C40 revision C prepared by Recor dated 29 November 2022.
Car Parking
29. A minimum of six (6) car parking spaces must be provided on the site. The carparking must
be generally in accordance with the approved plans and made available and accessible at
all times.
30. The caparking area must be linemarked and the spaces must be in accordance with
AS/NZS2890.1:2004.
31. All vehicles must enter and exit the site in a forward gear.
Stormwater Drainage
32. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with drawing number
C40 revision D prepared by Recor dated 15 March 2023 and include on-site rain water
storage (9,000 litres) used for non-potable purposes. The design of the on-site rain water
system must be submitted to Council at least 5 business days prior to the pre-start meeting.
Condition 32 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Services
33. Reticulated electricity and telecommunication services must be provided to each unit in
accordance with the standards and requirements of the relevant service provider.
34. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
Document Set ID: 22374890
Version: 10, Version Date: 06/08/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.