               DEVELOPMENT ASSESSMENT DELEGATED REPORT
               35.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               36.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               37.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               38.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               39.    All earthworks and associated retaining structures/batters, both above and below ground,
                      both temporary and permanent, must be contained entirely within the subject site unless
                      written permission from the respective landowner(s) is provided to Council.
               40.    All earthworks must be undertaken in accordance with the recommendations of the
                      Geotechnical Investigation, reference 22151-001-Rev 0 dated 13 May 2022 prepared by
                      Tectonic Geotechnical and Environmental Engineers.
                      Damage to Services and Assets
               41.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               LANDSCAPING
                      Landscaping Works
               42.    The development site must be landscaped in accordance with the PSP2 – Landscaping. The
                      works must be undertaken in accordance with Operational Works approval OPW22/0140
                      and the Noosa Plan for that specific area and must include in particular:
                      a.      the works generally shown on the Approved Plans except where varied by the
                              conditions of this approval.
               43.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               44.    All landscape works must be maintained generally in accordance with the approved design
                      for the life of the development.
                      Retention of Existing Trees
               45.    All works must be carried out in accordance with the Arboriculture Impact listed within this
                      Decision Notice *(Refer to Advisory Note)




                                                                                                     Page 28 of 42

Document Set ID: 22374890
Version: 10, Version Date: 06/08/2023
Log in to download the original file

Delegated Report - Code - Planning MCU22 0087 [As Published].pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.