DEVELOPMENT ASSESSMENT DELEGATED REPORT
46. Prior to any works commencing on site or prior to the issue of the building permit, a bank
guarantee or a bond of $5,000 must be lodged as security for the protection of the trees
identified for retention identified on the approved tree retention plan. The bond:
a. may be drawn upon by Council in its entirety if any one tree identified for retention is
damaged to the point where the tree cannot be saved (as confirmed by the project
arborist and agreed in writing by Council)
b. will be returned upon practical completion of all the operational works relating to this
development.
OPW22/0140 - DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (DRAINAGE WORK,
LANDSCAPING, STORMWATER & EARTHWORKS)
ENGINEERING
APPROVED PLANS
47. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the tables below. The plans must be amended to incorporate
the amendments listed within the table below and resubmitted to Council prior a prestart
meeting being held.
Plan No. Rev. Plan/Document Name Date
C30 D Bulk Earthworks Plan prepared by Recor 15 March 2023
Consulting
C31 D Bulk Earthworks Sections prepared by Recor 15 March 2023
Consulting
C40 D Roads & Drainage Layout Plan prepared by Recor 15 March 2023
Consulting
C41 D Roads & Drainage Details prepared by Recor 15 March 2023
Consulting
C42 D Stormwater Drainage Sections prepared by Recor 15 March 2023
Consulting
C43 D Driveway Longsection prepared by Recor 15 March 2023
Consulting
CD-001 A Specification Notes, prepared by, Project Urban 24/11/2022
CD-102 A Landscape Plan – Second Floor, prepared by, 27/02/2023
Project Urban
CD-103 A Landscape Plan – Second Floor, prepared by, 24/11/2022
Project Urban
CD-600 B Tree Retention and Removal Plan, prepared by, 24/11/2022
Project Urban
CD-900 B Construction Details, prepared by, Project Urban 28/02/2023
- 1 Arboricultural Impact Assessment, prepared by, 30/11/2022
Consult Arborist
Page 29 of 42
Document Set ID: 22374890
Version: 10, Version Date: 06/08/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.