MCU STA - 132 Solar Road - Planning Report

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

               Performance Outcomes                              Acceptable Outcomes
  PO3                                             No acceptable outcome provided
  Development has a scale and density that is
  compatible with the intent of the zone and the
  preferred character for the local area in which
  it is located.
                           Complies
                           The proposed Short-term Accommodation use is an appropriate
  Applicant’s Response     scale for the locality. The existing dwelling is appropriately located to
                           avoid conflicts with nearby land uses. The existing rural landscape
                           values and amenity of the locality will be maintained.


  Performance Outcomes                              Acceptable Outcomes
  PO4                                               AO4.1
  Visitor accommodation is located such that it     Accommodation adjacent to or within 50
  preserves the safety of guests and does not       metres of an existing electricity substation
  impact on the function of infrastructure          incorporates noise attenuation measures to
  including:                                        mitigate noise impacts.
       a) the major road network;
       b) the North Coast railway line;
       c) existing and future electricity supply
           infrastructure; and
       d) water supply and waste water
           treatment.
                           Complies
  Applicant’s Response
                           The subject site is not located within 50 metres of an existing
                           electricity substation.
  PO4                                               AO4.2
  Visitor accommodation is located such that it     Buildings and structures (including swimming
  preserves the safety of guests and does not       pools, sheds, tennis courts and outbuildings)
  impact on the function of infrastructure          are not constructed under overhead electricity
  including:                                        transmission lines, or within electricity
       a) the major road network;                   easements.
       b) the North Coast railway line;
       c) existing and future electricity supply
           infrastructure; and
       d) water supply and waste water
           treatment.
                           Complies
  Applicant’s Response     The existing dwelling and structures are not located under overhead
                           electricity transmission lines or within easements.




RG Strategic                   Town Planning Report – Short-term Accommodation                         17
Log in to download the original file

MCU STA - 132 Solar Road - Planning Report.pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.