Attached to the e-mail Shopping complex - Traffic Report & Stormwater Management Plan (Email 3 of 3 MCU17/0054.
Stormwater Management Plan 11-19 Hilton Terrace Tewantin [OCR of page images] _ — —SWITCHBACK 48 consulting Stormwater Management Plan 11-19 Hilton Terrace Tewantin PO BOX 151, CALOUNDRA GLD 4551 | PH. 0408 725 826
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 14 pages
Page 2
This report was prepared by a representative of Switchback 48 Consulting
Switchback 48 Consulting
PO Box 151
CALOUNDRA QLD 4551
Telephone: +61 408 725 826
Email: [email protected]
Record of Issue
Issue Status Author Review and Approval Date
A DA Issue LPR LPR 19-04-17
This report may only be used for the purpose with which it was commissioned and in accordance with the contract
between Switchback 48 Consulting and Martoo Consulting Pty Ltd. The scope of services is defined by the requests of the
client, time and financial agreements. Switchback 48 Consulting accepts no liability or responsibility whatsoever for or in
respect of any use of or reliance upon this report by any third party. Unauthorized use of this report in any form
whatsoever is prohibited.
SWMP – 11-19 Hilton Tce Tewantin 1
Page 3
Contents
1. Introduction ........................................................................................................................................ 3
1.1 Scope ............................................................................................................................................. 3
1.2 Site Description ............................................................................................................................. 3
2. Stormwater Quality............................................................................................................................. 4
3. Stormwater Quantity and Drainage .................................................................................................... 8
4. Conclusion ........................................................................................................................................... 9
References ............................................................................................................................................ 10
Appendix A – Proposal Plans................................................................................................................. 11
Appendix B – Site Survey ...................................................................................................................... 12
SWMP – 11-19 Hilton Tce Tewantin 2
Page 4
1. Introduction
1.1 Scope
This Stormwater Management Plan (SWMP) has been prepared to support a development
application for Material Change of Use for a proposed commercial development at 11-19
Hilton Terrace Tewantin. A proposal plan is provided as Appendix A.
This SWMP has been written to address stormwater quantity and quality generally in
accordance with Noosa Plan requirements and the Queensland Urban Drainage Manual
(QUDM, 2013).
1.2 Site Description
The existing site is almost completely impervious, comprising a number of buildings and
hardstand areas. Figure 1.1 shows existing site conditions and surface coverage.
The site is low-lying, having surface elevations generally between 1.0m and 2.0mAHD. As
such, the site will need to be filled in order to achieve adequate flood immunity and will
therefore be raised above the existing verge level.
A small stormwater catchment associated with Ernest Street flows into the site via an
existing pipe on the Eastern Site Boundary and is shown in the site survey provided in
Appendix B. This external catchment will need to be accommodated in the stormwater
design for the site.
Figure 1.1 – Existing Site Conditions
SWMP – 11-19 Hilton Tce Tewantin 3
Page 5
2. Stormwater Quality
A conceptual site drainage design has been prepared and is shown in Figure 2.1. The
detailed design will be completed with a future OPW application, with this conceptual design
is intended to show how the site could be drained and integrated with stormwater quality
treatment devices. The key aspects of this drainage design are:
External piped drainage from Ernest Street is incorporated/collected in the
underground site drainage system and connects to the trunk drainage in Hilton
Terrace
The site is divided into 2 catchments – with Catchment A drainage to the West and
Catchment B to the East
Bioretention devices are provided for each of the 2 site catchments and are located
in areas of landscaping
Parking and driveway areas are delivered to the bioretention devices as surface
flows (i.e. not in pipe) through grading of the parking surface and use of up-stand
kerb. This has allowed the bioretention basins to be setdown a minimal distance
below the level of the parking modules so the marcophyte plantings will be clearly
visible from both the street and the car park and thereby enhance the amenity of the
development
Roof areas are delivered to bioretention devices though a piped roofwater system
which may discharge to the devices via a surcharge pit (subject to detailed design)
Minor areas of the site (driveway ramp and external landscape batters) are not able
to drain back to the bioretention devices (as they are lower than these devices).
These areas have been accounted for in the modelling and it is proposed that some
sediment and gross pollutant removal is provided for these areas by including a litter
basket within the existing side entry pit in Hilton Terrace.
SWMP – 11-19 Hilton Tce Tewantin 4
Page 6
Figure 2.1 –
Proposed
Stormwater
Management Plan
SWMP – 11-19 Hilton Tce Tewantin 5
[OCR of page images]
WITCHBACK
48 consulting
no, Hate
ass
‘¢L12 proposed
‘amendments
BATT7Yohangas ia Rootnes
'30Van 17| Changes to carparhng & Toadng bay
tne
‘ZONE: NEIGHBOURHOOD CENTRE
AREA: 9662S0M
PROPOSED USE: RETAIL BUSINESS. TYPE 1- LOCAL
ENTERTAINMENT AND DINING BUSINESS-
SHOPS: 451sqm (22.55 cars. 1 space per 20sqm)
FOOD ESTABLISHMENTS: 496sqm inc. outdoor dining (24.8 cars
CARPARKING REQUIREMENT: 47.35 SPACES.
48 SPACES PROVIDED
LANDSCAPING REQUIREMENT: 366.2SQM ( 10% )
‘S43SQMACTUAL
Spaces 3
P iS)
gk
— Sig
pedestrian 38
‘crossing point
| 1
Ef 100 m2
restaurant
shop 1|shop 2
h
Tastee
restaurant}
Pre ome 2
MRV actess
000 ea
crossing, | 1
STREET
| 2000°~S900
scale
a ages Lol
B7 me) q1me 4 405 me |e r
f f f meses ‘amp _ {| antry 2)
4 t ee ; am qq 4
Te £ re E a
oh ee |
Teh- ee aS AS, - A
tananantnnnannnnn “ eRailk
285°32'30" 0.56 ' i‘ a LOTS 2&3
z a ON AP 152351 &
LOT 4 ON SP133160.
PARISH OF TEWANTIN
10000 20000 3662SQM
> ant Cae aa [oem
5 ‘SITE PLAN/ E
TEWANTIN RETAIL PTY LTD 1:200 @ AZ AM
site plan a ‘tlesign ‘item renaAGE FLOOR PLAN
62 hiton terrace Project TEWANTIN: Drawing no. Page Date
floor plan Bema eum cas | PROPOSED COMMERCIAL DA-07.1216.28 2B) vec 2016
Figure 2.1 -
_ ~~ Proposed
Stormwater
Management Plan
SWMP - 11-19 Hilton Tce Tewantin
Page 7
In order to gauge the effectiveness of the stormwater quality treatment train and confirm
sizing of the bioretention devices, a MUSIC V6 model was developed. The external
catchment in Ernest Street was excluded from the model and calculations as this area is not
being modified by the development and will not contribute flow to the proposed treatment
systems.
The MUSIC model was developed using the split-catchment approach document by Water
by Design (2010) in the MUSIC Modelling Guidelines for South-East Queensland using a 10-
year rainfall period for Noosa Shire based on a 6 minute time step. All source node
parameters are consistent with the above guidelines. The MUSIC model layout is shown in
Figure 2.2 and a summary of the source node properties for each of the site catchments is
provided in Table 2.1.
Figure 2.2 – MUSIC Model Layout
The sizing of the treatment train components were adjusted in MUSIC until a solution which
complies with the pollutant load reduction targets specified in the Noosa Shire Council
Planning Scheme was achieved. The resulting pollutant loads are specified in Table 2.2 and
resulting concept design parameters of the treatment train components are provided in Table
2.3.
SWMP – 11-19 Hilton Tce Tewantin 6
Page 8
Table 2.1 – Catchment Parameters for Source Nodes
Catchment A Catchment B Balance
(externally draining)
Roof 952m2 355m2 Nil
(100% imp) (100% imp)
Surface Level 778m2 1247m2 305m2
(90% imp) (90% imp) (90% imp)
Table 2.2 – Pollutant Load Estimates
Source Residual % Reduction Target
Flow (ML/yr) 5.7 5.0 3%
TSS (kg/yr) 749 144 81% >80%
TP (kg/yr) 2.15 0.62 71% >60%
TN (kg/yr) 16.4 7.2 56% >45%
Gross 119 0 100% >90%
Pollutants
(kg/yr)
Table 2.3 – Sizing of Stormwater Quality Treatment System Components
Catchment A Catchment B
Biopod Filter Area 30m2 25m2
Biopod Filter Depth 0.45m 0.45m
Biopod Extended 200mm 200mm
Detention
SWMP – 11-19 Hilton Tce Tewantin 7
Page 9
3. Stormwater Quantity and Drainage
The proposed development will result in a slight reduction in the overall level of
imperviousness of the site so overall stormwater runoff volumes and flowrate will not be
increased and stormwater detention is therefore not required in order to ensure ‘non -
worsening’.
In terms of drainage, the key issue to ensure no impacts from the development is to include
allowance from the existing external catchment from Ernest Street to continue to drain
through the site. This has been addressed in the SWMP presented in Figure 2.1.
SWMP – 11-19 Hilton Tce Tewantin 8
Page 10
4. Conclusion
The proposal has demonstrated that it can adequately achieve the stormwater quality and
quantity requirements of the Planning Scheme. This is achieved primarily through provision
of ‘at source’ bioretention devices for each of the site catchments.
The preliminary drainage design for the site delivers runoff to these devices at surface and
thorough this has allowed the devices to have minimal set down from the carpark levels.
This will allow the devices to visually integrate with the other landscaping and enhance the
amenity of the proposal.
The concepts documented in this report will be further refined at the detailed design stage
when a OPW application is lodged.
SWMP – 11-19 Hilton Tce Tewantin 9
Page 11
References
Water by Design (2010) MUSIC Modelling Guidelines Version 1.0
SWMP – 11-19 Hilton Tce Tewantin 10
Page 12
Appendix A – Proposal Plans SWMP – 11-19 Hilton Tce Tewantin [OCR of page images] consulting = SWITCHBACK 48 Appendix A — Proposal Plans SWMP - 11-19 Hilton Tce Tewantin
Page 13
ZONE: NEIGHBOURHOOD CENTRE
no. date amendments
AREA: 3662SQM
A 30Jan 17 Changes to carparking & loading bay
PP PROPOSED USE: RETAIL BUSINESS- TYPE 1- LOCAL
B 4 April 17 Changes to Rooflines PP ENTERTAINMENT AND DINING BUSINESS- FOOD & BEVERAGE
TOTAL USE AREA:
SHOPS: 451sqm (22.55 cars. 1 space per 20sqm)
FOOD ESTABLISHMENTS: 496sqm inc. outdoor dining (24.8 cars @ 1 per 20sqm)
CARPARKING REQUIREMENT: 47.35 SPACES
48 SPACES PROVIDED
LANDSCAPING REQUIREMENT: 366.2SQM ( 10% )
543SQM ACTUAL
HILTON TERRACE proposed
roundabout
pedestrian
existing kerb line crossing point
proposed kerb line
cycle lane
new kerb line
00 0 6,300
10,
2,100
R 1 8 new on-road carspaces 8
R
8,5
7,200
00
footpath stone entry wall footpath
8
3
SL1.20
1.0
6
1.1
1.1
5" 28.795 105°29'00" 14.937 36.62 1
9
9
9
1.2
garden
1.1
1.2
BM: SCREW IN KERB
RL: 1.07 '0 SL1.20 SL1.20 5. 50°
6 65 3
1,650
2,050
banked landscaping 7,802
°0 3 ramp access
1
SL1.60 ramp access
3 1'3
1.1
PP garden garden
TP 4
6 .00 0"
6 concrete wheel stops
SL1.60
concrete wheel stops garden
2,900
garden
6,000
carparking carparking
5,400
2,500
36.74
33 20 19
ERNEST STREET
SL1.85 9
1,200
SL1.85
scooter
2,600 parking 8
ramp (5)
12 proposed
entry 1 driveway
6,600
crossing
6,000
on-road car grade SL1.95
7
195°29'00"
grade 1:14
spaces 5%
footpath
1:20
600h stone stone wall vertical retractable
wall screens to perimeter
40.453
banked landscaping
SL1.35
15°34'00"
0
of outdoor dining
1.2
bollard
pedestrian
SL1.925 34 45 46 48
36.51
pedestrian ramp access
outdoor
concrete wheel stops
carparking
crossing point
22°43'1 0
0"
1.3
6
1.1
bicycle dining;
3,010
3,010
vertical retractable setdown
screens to perimeter outdoor parking area
of outdoor dining
dining 30sqm
SL1.85
SL2.25
REET
30 m2 SL2.35 SL2.35 footpath IL:-
1.5
2,400
100 4,900 100 garden garden
3,800
100 8,400 100 6,805 100
footpath 100 5,400 100
5
1.2
SL2.465
100
restaurant
EARL ST
outdoor outdoor outdoor outdoor 2,000 6,600 5,400 3,600
1 dining; dining; dining; dining; restaurant 17,600
footpath
MRV access
100 m2 1,500 20sqm 20sqm 20sqm 20sqm 2
FL2.50 FL2.50 60 m2
crossing 1
shop 7
shop 1 shop 2 shop 3 shop 4 shop 5 49 m2 49 m2 49 m2 49 m2
SL2.35
SL2.05
1,500
vets
14,300
pedestrian
1,500 st ramp access
D 57 m2 71 m2 68 m2 66 m2 64 m2 cafe 1 cafe 2 cafe 3 cafe 4 125 m2
garden
FL 2.50 ramp entry 2
6,000
6,000
grade
1
grade
1.2
bin store SL2.05 1:14 1:20
0
M F
1.4
1100L bulk bins
1.55
195°29'00"
1,5
PP TE s
1,900 1,500
ord
190
3,500
gate loading
00
1,500
gate sewer- zone of influence ec
toilets. service path 9
1.3 cil r
40.469
PP
3
IL:- coun
3,400
3,400
3,200
1.3
IL:-1.32
by
bay banked garden
36sqm garden sewer line by council records
3
1.4
paling screen fence on retaining wall paling fence on retaining wall
37.926 14.937 285°32'30" 40.56
9
1.3
PP
8,800 6,600
LOTS 2 & 3
6
1.5
11,301 1,500 62,595 17,600 ON RP152351 &
LOT 4 ON SP133160.
PARISH OF TEWANTIN
0 2000 5000 10000 20000 3662SQM
Client Location Drawing Scale Drawn
scale SITE PLAN/
site plan TEWANTIN RETAIL PTY LTD
11-19 HILTON TERRACE FLOOR PLAN
1:200 @ A2 AM
TEWANTIN
floor plan 62 hilton terrace
noosaville (07) 5449 9066
[email protected] QBSA reg. 65073
Project
PROPOSED COMMERCIAL
DEVELOPMENT
Drawing no.
DA-07.1216.2B
Page
2B
Date
DEC 2016
Page 14
Appendix B – Site Survey SWMP – 11-19 Hilton Tce Tewantin [OCR of page images] = SWITCHBACK 48 consulting Appendix B — Site Survey SWMP - 11-19 Hilton Tce Tewantin
Page 15
LEGEND
LINETYPE LEGEND TREES SERVICES
PP A - ASH EJ - ELECTRIC JUNCTION BOX
BUILDING
CONCRETE
KERB
TOTAL SITE AREA 3662m² B - BLOODWOOD
BA - BANKSIA
BB - BOTTLE BRUSH
BX - BOX
HCB - HOUSE CONNECTION BRANCH
HY - HYDRANT
HW - HEADWALL
IL - INVERT LEVEL
CD - CADAGHI LL - LID LEVEL
GUTTER/BANK CI - CITRUS LP - LIGHT POLE
CL - CAMPHOR LAUREL MH - MAN HOLE
GRAVEL F - FIG PP - POWER POLE
MAX WATTERSON
D DRAINAGE DENOTES DIRECTION
G - GUM SV - STOP VALVE
GC- GOLDEN CANE SWP - STORMWATER PIT
S SEWER 1 OF PHOTO TAKEN. HP - HOOP PINE TE - TELSTRA PIT
E POWER 1 IB - IRONBARK
J - JACARANDA
WM - WATER METER
+ASSOCIATES
BITUMEN LEP- LEOPARD
HILT
1
MA - MAHOGANY
WALL MO - MANGO
O
MP - MAPLE OTHER
FENCE
N
N - NATIVE
LINE MARKING P - PALM AHD - AUSTRALIAN HEIGHT DATUM
CONSULTING SURVEYORS
PB- PAPERBARK BM - BENCH MARK
BOUNDARY PI - PINE E.D.A. - EFFLUENT DISPOSAL AREA
PP PN - PANDANAS H.S.A. - HOUSE SITE AREA
TREE
64°06'05" PO - POINCIANA
S - STRINGYBARK
FFL - FINISHED FLOOR LEVEL
RL - REDUCED LEVEL
& PLANNERS
6.003 SC - SCRUB
SH - SHE OAK NOTE:
SI - SILKY OAK TREES UNDER 0.3m TRUNK
UM - UMBRELLA DIAMETER NOT LOCATED.
12 Maple Street
T ER
WL - WATTLE
X - EXOTIC
PO Box 639
RA Cooroy Qld 45
2
CON
CR ETE
CE Ph. (07) 54426121
Fax. (07) 54425125
STR
IP DRA Email. [email protected]
T
IN
28.7
EE
95 0.6m
X 0.3
m
SWP
Client: BDH NOMINEES
STR
PTY. LTD.
1
105 93
3
14.9 °29'00"
ALL
0.
37
GW
ININ
ET A
CON
CR ETE
36. 3'10"
Project:
CK R
STR
IP
1
DRA
5235
1
IN
BL O
5235
74
36.6 PLAN SHOWING
4
R P1
2
22°
R P1
DETAILS OF LOTS 2 &
DEN
3
RL
GA R
150°31'30"
TER
3 ON RP152351 &
B
UT
5.653
C
2
&G
EA
Emt
Emt
LOT 4 ON SP133160.
RB
KE
4
ND
0"
ISLA
1950°.453
29'0
L
0"
4
WAL
IN
DRA
29'0
69
ING
PARISH: TEWANTIN
"
RIP
IN
4'00
15°3 .51
40.4
ET A
RAM
195°
4
E ST
P
COUNTY: MARCH
CK R
36
T
CRE
BL O
LOCAL GOVT: SUNSHINE COAST R.C.
CON
37.9 LOCALITY: TEWANTIN
26
268 5
6
SP132627 Scale: 1:400
Plan 1 of 1
14.9 Date: 10-08-11
37 Datum: AHD
EET
2 Origin:
PM 52592
RL 1.467
2 285° Cont.Int: 0.25m
Ref:
32'30
STR
" 40.5
6 11-3149AA
NOTE:
168
TER
SP132627 This plan has been prepared for building
GUT
lease A design purposes only.
B&
PHOTO 1 PHOTO 2 PM 52592
RL: 1.467
KER
Underground services not located except
where evident on surface.
EST
ER N
0 4 8 12 16 20m
PHOTO 3 PHOTO 4 PHOTO 5 PHOTO 6