Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Att 8 - SWMP

Attached to the e-mail Shopping complex - Traffic Report & Stormwater Management Plan (Email 3 of 3 MCU17/0054.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

             4. Conclusion
             The proposal has demonstrated that it can adequately achieve the stormwater quality and
             quantity requirements of the Planning Scheme. This is achieved primarily through provision
             of ‘at source’ bioretention devices for each of the site catchments.

             The preliminary drainage design for the site delivers runoff to these devices at surface and
             thorough this has allowed the devices to have minimal set down from the carpark levels.
             This will allow the devices to visually integrate with the other landscaping and enhance the
             amenity of the proposal.

             The concepts documented in this report will be further refined at the detailed design stage
             when a OPW application is lodged.




SWMP – 11-19 Hilton Tce Tewantin                                                                            9
Log in to download the original file

Att 8 - SWMP.pdf · 5.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.