Att 8 - SWMP
Attached to the e-mail Shopping complex - Traffic Report & Stormwater Management Plan (Email 3 of 3 MCU17/0054.
4. Conclusion
The proposal has demonstrated that it can adequately achieve the stormwater quality and
quantity requirements of the Planning Scheme. This is achieved primarily through provision
of ‘at source’ bioretention devices for each of the site catchments.
The preliminary drainage design for the site delivers runoff to these devices at surface and
thorough this has allowed the devices to have minimal set down from the carpark levels.
This will allow the devices to visually integrate with the other landscaping and enhance the
amenity of the proposal.
The concepts documented in this report will be further refined at the detailed design stage
when a OPW application is lodged.
SWMP – 11-19 Hilton Tce Tewantin 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.