3. Stormwater Quantity and Drainage
The proposed development will result in a slight reduction in the overall level of
imperviousness of the site so overall stormwater runoff volumes and flowrate will not be
increased and stormwater detention is therefore not required in order to ensure ‘non -
worsening’.
In terms of drainage, the key issue to ensure no impacts from the development is to include
allowance from the existing external catchment from Ernest Street to continue to drain
through the site. This has been addressed in the SWMP presented in Figure 2.1.
SWMP – 11-19 Hilton Tce Tewantin 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.