Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Att 8 - SWMP

Attached to the e-mail Shopping complex - Traffic Report & Stormwater Management Plan (Email 3 of 3 MCU17/0054.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

             3. Stormwater Quantity and Drainage
             The proposed development will result in a slight reduction in the overall level of
             imperviousness of the site so overall stormwater runoff volumes and flowrate will not be
             increased and stormwater detention is therefore not required in order to ensure ‘non -
             worsening’.

             In terms of drainage, the key issue to ensure no impacts from the development is to include
             allowance from the existing external catchment from Ernest Street to continue to drain
             through the site. This has been addressed in the SWMP presented in Figure 2.1.




SWMP – 11-19 Hilton Tce Tewantin                                                                           8
Log in to download the original file

Att 8 - SWMP.pdf · 5.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.