Original source · versioned page text
Att 8 - SWMP
Attached to the e-mail Shopping complex - Traffic Report & Stormwater Management Plan (Email 3 of 3 MCU17/0054.
Figure 2.1 –
Proposed
Stormwater
Management Plan
SWMP – 11-19 Hilton Tce Tewantin 5
[OCR of page images]
WITCHBACK
48 consulting
no, Hate
ass
‘¢L12 proposed
‘amendments
BATT7Yohangas ia Rootnes
'30Van 17| Changes to carparhng & Toadng bay
tne
‘ZONE: NEIGHBOURHOOD CENTRE
AREA: 9662S0M
PROPOSED USE: RETAIL BUSINESS. TYPE 1- LOCAL
ENTERTAINMENT AND DINING BUSINESS-
SHOPS: 451sqm (22.55 cars. 1 space per 20sqm)
FOOD ESTABLISHMENTS: 496sqm inc. outdoor dining (24.8 cars
CARPARKING REQUIREMENT: 47.35 SPACES.
48 SPACES PROVIDED
LANDSCAPING REQUIREMENT: 366.2SQM ( 10% )
‘S43SQMACTUAL
Spaces 3
P iS)
gk
— Sig
pedestrian 38
‘crossing point
| 1
Ef 100 m2
restaurant
shop 1|shop 2
h
Tastee
restaurant}
Pre ome 2
MRV actess
000 ea
crossing, | 1
STREET
| 2000°~S900
scale
a ages Lol
B7 me) q1me 4 405 me |e r
f f f meses ‘amp _ {| antry 2)
4 t ee ; am qq 4
Te £ re E a
oh ee |
Teh- ee aS AS, - A
tananantnnnannnnn “ eRailk
285°32'30" 0.56 ' i‘ a LOTS 2&3
z a ON AP 152351 &
LOT 4 ON SP133160.
PARISH OF TEWANTIN
10000 20000 3662SQM
> ant Cae aa [oem
5 ‘SITE PLAN/ E
TEWANTIN RETAIL PTY LTD 1:200 @ AZ AM
site plan a ‘tlesign ‘item renaAGE FLOOR PLAN
62 hiton terrace Project TEWANTIN: Drawing no. Page Date
floor plan Bema eum cas | PROPOSED COMMERCIAL DA-07.1216.28 2B) vec 2016
Figure 2.1 -
_ ~~ Proposed
Stormwater
Management Plan
SWMP - 11-19 Hilton Tce Tewantin
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.