In order to gauge the effectiveness of the stormwater quality treatment train and confirm
sizing of the bioretention devices, a MUSIC V6 model was developed. The external
catchment in Ernest Street was excluded from the model and calculations as this area is not
being modified by the development and will not contribute flow to the proposed treatment
systems.
The MUSIC model was developed using the split-catchment approach document by Water
by Design (2010) in the MUSIC Modelling Guidelines for South-East Queensland using a 10-
year rainfall period for Noosa Shire based on a 6 minute time step. All source node
parameters are consistent with the above guidelines. The MUSIC model layout is shown in
Figure 2.2 and a summary of the source node properties for each of the site catchments is
provided in Table 2.1.
Figure 2.2 – MUSIC Model Layout
The sizing of the treatment train components were adjusted in MUSIC until a solution which
complies with the pollutant load reduction targets specified in the Noosa Shire Council
Planning Scheme was achieved. The resulting pollutant loads are specified in Table 2.2 and
resulting concept design parameters of the treatment train components are provided in Table
2.3.
SWMP – 11-19 Hilton Tce Tewantin 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.