Council archive · source document
08/0170 - MCU - Multiple Housing Type 2 Duplex [As Published] · 132008.170
Condition 13 Swimming pools intrude into (the) zone of influence of sewer. Swimming pools to be a minimum of 1.5m clear of sewer or clear of the zone of influence of the sewer (whichever is the greater). The relocation of the swimming pools towards the frontage of the dwelling units has been undertaken to both ensure the sewer line zone of influence remains clear of structures, and improve the residential amenity of the property adjacent to the rear boundary of the site. A vehicle access driveway to serve the duplex shail be constructed from the Egret Street frontage of the site with a maximum width of 3 metres. The proposed driveway complies with this requirement. Condition 20 A Park contribution of $2,791 towards the acquisition of additional parkland or the improvement of existing parkland and facilities in the locality shall be paid to the Council prior to obtaining a Development Permit for Operational Works in accordance with Council's Planning Scheme Policy PSP24 Park Requirements. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from June 2004 until the date of payment. The applicant acknowledges that the Park Contribution amount quoted. in Condition “20 is to be updated in accordance with the CPI increases occurred since June 2004. Condition 22 A pathway contribution of $492 towards external major pathways, in accordance with Planning Scheme Policy Coastal Major Pathway Contributions, shall be paid to the Council prior to obtaining a Development.Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from June 2004 until the date of payment. The applicant acknowledges that the Pathway Contribution amount quoted in Condition 22 is to be updated in accordance with the CPI increases occurred since June 2004. Condition 27 The existing sewer main that traverses the site and is located in the adjoining property and pathway and the ‘zone of influence’ (taken as the area within a 45 degree angle measured from the invert level of the sewer main to the finished surface level) shall be accurately located and determined by a licenced Surveyor and shown on all plans submitted for Operational Works.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0170 - MCU - Multiple Housing Type 2 Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.