Council archive · source document
08/0170 - MCU - Multiple Housing Type 2 Duplex [As Published] · 132008.170
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of damage no structures requiring a building permit (eg. buildings, swimming pools, retaining walls, raised terraces, etc) shall be constructed within this ‘zone of influence’ and as such the applicant shall amend Operational Works plans including Building plans to ensure compliance. The roofed BBQ structure in the south-western corner of the site shall be amended so that it stands a minimum of 1.8 metres from the existing sewer. The location of the BBQ area in relation to the sewer is to be certified by the licenced surveyor and submitted to Council for approval. In order to ensure the sewer line zone of influence remains clear of structures, the BBQ area has been deleted and the main recreational spaces have been relocated towards the front of each dwelling unit. These changes ensure both the integrity of Council’s infrastructure as well as the protection of the neighbouring residential amenity. Condition 29 The roofed bin store in the south-eastern corner of the site shall be setback a minimum of 1.5 metres from the existing sewer. The location of the bin store in relation to the sewer and the property boundary is to be certified by the licenced surveyor and submitted to Council for approval. In order to ensure the sewer line zone of influence remains clear of structures, the bin store area has been relocated towards the front of each dwelling unit. This change ensures both the integrity of Council’s infrastructure as well as the protection of the neighbouring residential amenity. Condition 33 Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates applicable at the time of payment. An estimate only of the contribution rates as of June 2004 under the current policies is as follows: : Water Supply $4,230 Sewerage $1,476 TOTAL $5,706 All headworks contributions must be paid prior to the issue of a Development Permit for Operational Works. Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0170 - MCU - Multiple Housing Type 2 Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.