Council archive · source document
08/0170 - MCU - Multiple Housing Type 2 Duplex [As Published] · 132008.170
The applicant acknowledges that the Infrastructure Contribution amount quoted in Condition 33 is to be updated in accordance with the CPI increases occurred since June 2004. Condition 35 A Geotechnical Engineer or similarly qualified expert shall assess the soil condition on site, determine the soil classification, establish whether any measures are required to protect the stability of adjoining buildings and/or structures, and make recommendations on the type of foundation system(s) best suited for the proposed development. This information shall be submitted to the Council for assessment and approval prior to obtaining a Development Permit for Operational Works. The applicant requests Council amend this condition to require a Geotechnical Report to be prepared and complied with as part of the Operational Works process. This solution is consistent with the current requirements of The Noosa Plan. Advice 1 Approval of this development application has triggered an Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure Changes Plan for the amount of $3,470 and is subject to variations in the Consumer Price Index, All Groups Brisbane from June 2004 until the date of payment. An Infrastructure Charge Notice is attached in accordance with Chapter 5 of the Integrated Planning Act 1997. The applicant acknowledges that the ICP Charge quoted in Advice Condition 1 is to be updated in accordance with the.CPI increases occurred since.June 2004... .
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0170 - MCU - Multiple Housing Type 2 Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.