Council archive · source document
Decision Notice - 010.2008.00000771.001 [As Published] · 142008.771
Officer: Ann Moore
Direct Telephone: (07) 5449 5269
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 2008/771
Your Reference:
26 May 2008
Gateway Rise Pty Ltd
CARE Project Strategy Qld Oty Ltd
62 Buderim Avenue
ALEXANDRA HEADLANDS QLD
Dear Sir/Madam,
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 26 May 2008 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2008/771
Street address: 50 Gateway Drive NOOSAVILLE
Real property description: LOT: 81 SP: 211687
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Development Permit for Operational Works - Landscaping
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Permit is 2 years from the date that this
development application takes effect.
4 ASSESSMENT MANAGER CONDITIONS
1. The development shall be carried out in accordance with the approved plans listed
below or as modified herein.
2. The finished level of all mulch in garden beds and landscaped medians is to be a
minimum of 50mm below the level of the adjacent top of kerb. All landscaping is to be
constructed in accordance with Council’s Planning Scheme Policy PSP03
Landscaping Plants and Guidelines.
Page 1 of7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
2008/771
3. Suitable root barrier shall be installed where proposed trees are adjacent to paths,
pavement, etc; in accordance with Council’s Planning Scheme Policy PSP03
Landscaping Plants and Guidelines.
4. Any plants with an expected width of 2 to 3 metres shall not be placed within 1
(one) metre of the pathway from Gateway Drive to the Estate.
5. Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7)
days’ notice of intention to commence works to arrange a “pre start” meeting prior to
the commencement of works.
6. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to
ensure that any sub contractors also have the appropriate insurance and public
liability documentation.
7. Prior to the “pre start” meeting, the principal contractor must be provided with
a copy of Council’s signed approved drawings and conditions by the applicant.
8. The Consulting Engineers for the project shall be currently Registered Professional
Engineers of Queensland (RPEQ). The consulting engineers are responsible for
arranging all inspections, with Council’s Construction Technical Officer or nominated
staff. Council’s Construction Technical Officer shall provide an inspection form for
signing off by the Engineer at appropriate stages of construction, during on-site
meetings. Construction Technical Officer will also sign the form at each stage when
conditions required have been satisfied. The works will be accepted “On
Maintenance” after this form, signed by the inspector for each stage is complete,
together with a letter from the Engineer requesting that the works go “On
Maintenance”.
9. Prior to works commencing, Council is to be advised of the Engineer (RPEQ)
supervising the project. (This person will be the contact for the project).
10. Council standards shall apply to these works unless otherwise modified herein.
11. The person acting on this permit shall ensure that its consultants and contractors take
all reasonable care during the construction of the engineering works to ensure that
Council property, road pavements or facilities (such as underground drainage, water
supply, sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected
against any damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors
shall forthwith notify the Manager Land Development and shall forthwith rectify the
damage to that property or facility at its cost and to the satisfaction of the Manager
Land Development.
All rectification works are to be completed prior to the sealing of the survey plan or,
alternatively, the Applicant may request the Council to carry out the rectification work
at the Applicant’s cost, such cost being paid by the Applicant to the Council prior to
the sealing of the survey plan.
In the case of any emergency the Council shall be entitled to rectify such damage at
the cost of the Applicant, such cost being paid prior to the sealing of the survey plan.
12. The development of the site shall be carried out in such a manner as to prevent dust
and/or sand nuisance to residents and/or tenants in the vicinity of the development.
Page 2 of 7
Page 3
2008/771
13. Construction work and other associated activities are permitted only during the hours
of 7.00 am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or
public holidays, except where extended hours are approved by the Manager, Land
Development, or his nominee.
14. All signage, including that for safety during construction shall be in accordance with
the Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads)
Act.
15. Sediment and erosion control measures must be in place prior to works commencing.
If such measures are not in place or are not satisfactory, “on the spot “ fines may be
issued. Such fines can be issued if sediments from the site are found to enter or have
the potential to enter Council’s stormwater system or natural waterways. Council’s
Manager, Land Development may request further controls to be installed should
existing measures be inefficient.
16. The works to become Council assets will not be accepted "On Maintenance" until the
landscaping is completed.
17. These works are also to be in compliance with the relevant conditions of Decision
Notice No.2007/1626 dated 13 December 2007.
18. Notwithstanding that Council has checked the plans with due care, where it is found
during construction that variations from Council's standards exist, then Council
standards shall apply
5 REFERRAL AGENCY CONDITIONS
Not Applicable.
6 APPROVED PLANS
The approved plans for this development approval are listed in the following table:
Plan No. Rev. Plan Name Date
ED7197 OPW- A 10 April 2008
Locality Plan and Specifications
01
ED7197 OPW- A 10 April 2008
Landscape Plan and Plant Schedule
02
ED7197 OPW- A 10 April 2008
Landscape Plan
03
ED7197 OPW- A 10 April 2008
Bio-retention planting plan and details
04
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions
of approval:
Should any changes or modifications to the approved plans be required as a result
of construction constraints, a Request to Change an Existing Approval application
under the Integrated Planning Act 1997 must be made. Amended plans clearly
indicating the changes must be lodged with this application along with the
appropriate fees.
Page 3 of 7
Page 4
2008/771
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person
who carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss
any obligations under the ACH Act.
8 PROPERTY NOTES
Not Applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not Applicable.
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Subject of the required Development Permit
required
Not Applicable
11 SELF ASSESSABLE CODES
Not Applicable
12 SUBMISSIONS
Not Applicable.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions
from the Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council
about the conditions contained within the development approval. If Council agrees or part
agrees with the representations, a “negotiated decision notice” will be issued. Only one
“negotiated decision notice” may be given. Taking this step will defer your appeal period,
which will continue after Council makes its decision. (Refer to sections 3.5.17 and 3.5.18 of
the Integrated Planning Act 1997).
Page 4 of 7
Page 5
2008/771
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies of
Council’s decision are available on line at www.sunshinecoast.qld.gov.au, or at Council
Offices.
Yours faithfully
Mark Lewis
SENIOR DEVELOPMENT ASSESSMENT OFFICER
Page 5 of 7
Page 6
[document year]/[document number]
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
(5) If an application is processed under section
The following is an extract from the Integrated 6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4). application are available only for the aspects of the
Division 8 - Appeals to court relating to development that would have required public
development applications notification under the repealed Act.
Appeals by applicants
(6) If an application involves assessment
4.1.27.(1) An applicant for a development against a concurrence agency code, appeal rights
application may appeal to the court against any of for submitters for the application are not available
the following- against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a concurrence agency’s response for the code.
development application; Appeals by advice agency submitters
(b) a matter stated in a development approval, 4.1.29.(1) An advice agency may, within the limits
including any condition applying to the of its jurisdiction, appeal to the court about the
development, and the identification of a code giving of a development approval for a
1
under section 3.1.6; development application if-
(c) the decision to give a preliminary approval (a) the development application involves impact
when a development permit was applied for; assessment; and
(d) the length of a currency period; (b) the advice agency told the applicant and the
(e) a deemed refusal. assessment manager to treat its response to
(2) An appeal under subsection (1)(a) to (d) the application as a submission for an appeal.
must be started within 20 business days (the (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the business days after the day the decision notice or
decision notice or negotiated decision notice is negotiated decision notice is given to the advice
given to the applicant. agency as a submitter.
(3) An appeal under subsection (1)(e) may be Appeals for matters arising after approval given
started at any time after the last day a decision on (co-respondents)
the matter should have been made. 4.1.30.(1) For a development approval given for a
Appeals by submitters development application, a person to whom any of
4.1.28.(1) A submitter for a development the following notices have been given may appeal
application may appeal to the court about- to the court against the decision in the notice-
(a) the giving of a development approval, including (a) a notice giving a decision on a request for
any conditions (or lack of conditions) or other extension of the currency period for an
provisions of the approval; or approval;
(b) the length of a currency period for the approval. (b) a notice giving a decision on a request to make
a minor change to an approval.
(2) The appeal must be started within 20
business days (the “submitters appeal period”) (2) The appeal must be started within 20
after the day the decision notice or negotiated business days after the day the notice of the
decision notice is given to the submitter. decision is given to the person.
(3) If a person withdraws a submission before (3) Subsection (1)(a) does not apply if the
the application is decided, the person may not approval resulted from a development
appeal the decision. application (superseded planning scheme)
that was assessed as if it were an
(4) If an application involves both impact application under a superseded planning
assessment and code assessment, appeal rights scheme.
for submitters are available only for the part of the
application involving impact assessment. (4) Also, a person who has made a request
mentioned in subsection (1) may appeal to
the court against a deemed refusal of the
request.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 6 of7
Page 7
[document year]/[document number]
(5) An appeal under subsection (4) may be Rights of appeal conferred by Section 4.2.9 of the
started at any time after the last day the Integrated Planning Act 1997 as follows:
decision on the matter should have been Division 3 – Appeals to tribunals relating to
made. development applications
Division 9 - Appeals to court about other Appeals by applicants
matters
4.2.9(1) An applicant for a development application
Appeals for matters arising after approval given may appeal to the Building and Development
(no co-respondents) Tribunal against any of the following-
4.1.31.(1) A person to whom any of the following (a) the refusal, or the refusal in part, of a
notices have been given may appeal to the court development application;
against the decision in the notice-
(b) a matter stated in a development approval,
(a) a notice giving a decision on a request to including any condition applying to the
change or cancel a condition of a development development, and the identification of a code
approval. under section 3.1.6;
3
2
(b) a notice under section 6.1.44 giving a decision (c) the decision to give a preliminary approval when a
to change or cancel a condition of a development permit was applied for;
development approval.
(d) the length of a period mentioned in section 3.5.21
(2) The appeal must be started within 20 currency period;
business days after the day the notice of the
(e) a deemed refusal.
decision is given to the person.
(2) An appeal under subsection (1)(a) to (d) must
(3) Also, a person who has made a request be started within 20 business days (the “applicant’s
mentioned in subsection (1)(a) may appeal appeal period”) after the day the decision notice or
to the court against a deemed refusal of the negotiated decision notice is given to the applicant.
request.
(3) An appeal under subsection (1)(e) may be
(4) An appeal under subsection (3) may be started at any time after the last day a decision on the
started at any time after the last day the matter should have been made.
decision on the matter should have been The Registrar for the Building and Development
made. Tribunal may be contacted at the website
Appeals against decisions to change approval http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.
(2) The appeal must be started within 20
business days after the day notice of the decision
is given to the applicant.
For Building Works Only
2
Section 6.1.44 (Conditions may be changed or
3
cancelled by assessment manager or concurrence Section 3.1.6 (Preliminary approval may override
agency in certain circumstances) local planning instrument)
Page 7 of 7
Used in these records
Decision Notice - 010.2008.00000771.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 54 KB (small file)
- File type
No other editions are linked here.