Council archive · source document
Decision Notice - 010.2008.00000771.001 [As Published] · 142008.771
2008/771
3. Suitable root barrier shall be installed where proposed trees are adjacent to paths,
pavement, etc; in accordance with Council’s Planning Scheme Policy PSP03
Landscaping Plants and Guidelines.
4. Any plants with an expected width of 2 to 3 metres shall not be placed within 1
(one) metre of the pathway from Gateway Drive to the Estate.
5. Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7)
days’ notice of intention to commence works to arrange a “pre start” meeting prior to
the commencement of works.
6. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to
ensure that any sub contractors also have the appropriate insurance and public
liability documentation.
7. Prior to the “pre start” meeting, the principal contractor must be provided with
a copy of Council’s signed approved drawings and conditions by the applicant.
8. The Consulting Engineers for the project shall be currently Registered Professional
Engineers of Queensland (RPEQ). The consulting engineers are responsible for
arranging all inspections, with Council’s Construction Technical Officer or nominated
staff. Council’s Construction Technical Officer shall provide an inspection form for
signing off by the Engineer at appropriate stages of construction, during on-site
meetings. Construction Technical Officer will also sign the form at each stage when
conditions required have been satisfied. The works will be accepted “On
Maintenance” after this form, signed by the inspector for each stage is complete,
together with a letter from the Engineer requesting that the works go “On
Maintenance”.
9. Prior to works commencing, Council is to be advised of the Engineer (RPEQ)
supervising the project. (This person will be the contact for the project).
10. Council standards shall apply to these works unless otherwise modified herein.
11. The person acting on this permit shall ensure that its consultants and contractors take
all reasonable care during the construction of the engineering works to ensure that
Council property, road pavements or facilities (such as underground drainage, water
supply, sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected
against any damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors
shall forthwith notify the Manager Land Development and shall forthwith rectify the
damage to that property or facility at its cost and to the satisfaction of the Manager
Land Development.
All rectification works are to be completed prior to the sealing of the survey plan or,
alternatively, the Applicant may request the Council to carry out the rectification work
at the Applicant’s cost, such cost being paid by the Applicant to the Council prior to
the sealing of the survey plan.
In the case of any emergency the Council shall be entitled to rectify such damage at
the cost of the Applicant, such cost being paid prior to the sealing of the survey plan.
12. The development of the site shall be carried out in such a manner as to prevent dust
and/or sand nuisance to residents and/or tenants in the vicinity of the development.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000771.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 54 KB (small file)
- File type
No other editions are linked here.