21.2.5. headworks shall be calculated as the value of headworks assess at the
ordinarily due time of payment, plus interest charged at the rate set by the
Queensland Treasury Corporation for Local Government borrowings as
they apply to Noosa Shire. The interest rate used shall be the rate current
at the “time prescribed” above;
21.2.6. should the contributions no be paid at the due time, Council shall call upon
the securities lodged; and
21.2.7. in the case of a Development Permit for building works, if a permit expires
the securities will be returned.
22. The developer shall provide metered water connections from the water supply system to the
proposed development, in accordance with Council’s standards and to the satisfaction of the
shire Engineer.
23. The footpath across the Gympie Terrace frontage of the site is to be fully paved from the
kerb and channel to the property alignment, and landscaped to the satisfaction for the Shire
Engineer. The pavement is to be designed and constructed to ensure pedestrian safety using
non-slip materials and to produce an evenly graded surface finish. The developer is to match
the existing brick footpaths already constructed in Gympie Terrace. In addition, the developer
is to remove the existing vehicle crossover located in Gympie Terrace, and reinstate the kerb
and channel to the satisfaction of the Shire Engineer,
The developer is to construct a 1.2 metre wide concrete footpath in the Elizabeth Street
frontage of the site. The forming, grassing and tip soiling of the remaining areas of the verge
are to be completed to the standards and requirements of the Shire Engineer. A meandering
footpath is desirable.
24. The site is to be filled to the levels nominated by the Shire Engineer to provide adequate site
drainage. Floor levels for all buildings and other structures and car park areas are to be in
accordance with the requirements of the Shire Engineer. A Building Approval shall not be
granted until the Shire Engineer has approved all levels. Fill and floor levels will be provided
on application to the Council’s Engineering Department. Any filling works undertaken on the
site shall be carried out in accordance with Section 3.8 of Council’s “Engineering Design
Standards” manual so as not to cause the ponding of water on any adjoining lands or the
blockage of, or interference with, any natural watercourses. No earthworks or filling works
are to be undertaken until issue of a Building Approval.
25. Roof and surface water is to be collected on site and is to be discharged through a signle
underground drain line into existing drainage in Gympie Terrace and/or Elizabeth Street to
the satisfaction of the Shire Engineer. A Building Approval shall not be granted until the Shire
Engineer has approved of the drainage scheme.
Approved Plans
26. Development is to be undertaken in accordance with this change to existing approvals
51997.2399.01 & 51997.2399.02 must generally comply with the approved plans of
development. The approved plans relating to the development and Unit 3 & 4 are listed in
the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
- - Level 3 Plan, prepared by Greg Gibbs 16 November 2022
Architects (amended by Brennan Planning Pty (received by Council)
Ltd) (Unit 4)
- - Elevation Plan, prepared by applicant (Unit 4) 5 September 2022
(received by Council)
Page 4 of 7
Document Set ID: 22711656
Version: 3, Version Date: 01/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Minor Change - 51997 2399 02 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 156 KB (small file)
- File type
No other editions are linked here.