PARTIAL RESPONSE TO COUNCIL’S INFORMATION
REQUEST
PROPOSED COMMERCIAL SUBDIVISION DEVELOPMENT
AT NOOSA CIVIC, 28 EENIE CREEK ROAD,
NOOSAVILLE, QLD, 4566
This correspondence is provided as a partial response to Noosa Shire Council’s Information
request for the subdivision development at the above address (Council reference OPW20-0145),
dated 29th September 2020.
Item 1
Indicate the location of the emergency gate as described in Condition 2.1 (Lot 23)
Response
Please refer to Drawing 1856-R40 demonstrating the emergency gate position and type.
Item 3
Provide a detailed plan of the pathway connection to Lot 23 as described in Condition 9
Response
Please refer to Drawing 1856-R41 demonstrating the location and construction information for the
pedestrian link from proposed Lot 23 to the existing walkway path along Eenie Creek Road.
Item 4
Indicate on the relevant plans the signage as described in Condition 15
Response
Please refer to Drawings 1856 R65-R66 and R68-R69 demonstrating the private road signage as
required by Condition 15 of the Court Ordered approval.
Item 5
Clarify the proposed width for Road B and demonstrate compliance with Condition 16
Response
Please refer to Drawing 1856-R46 with additional information to confirm the design road reserve
widths and pavement widths are compliant with Condition 16
1856 – Stockwell Development Group – Noosa Civic Page 1 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
Item 6 Amend the pathway width on the western side of Road C to be in accordance with Condition 17 Response Please refer to Drawings 1856 R36 & R39 which demonstrates this footpath width is compliant with Condition 17. The 3m footpath width is proposed to be initiated at the pedestrian crossing location to the eastern side of Road C as this ensures suitable verge width for Stormwater Quality Treatment devices and drainage structures in the verge and provides a clear transition point from a 2m wide footpath to 3m wide. Item 7 Road C is proposed with a 15m carriageway, compared with the 12m width required in Condition 17. Clarify how the proposed wider width is proposed to be used and operated. Response Please refer to Drawing 1856-R52 with additional information to confirm the design road reserve widths and pavement widths are compliant with Condition 17. The 15m carriageway (measured between kerb inverts or nominal face of kerbs) is inclusive of the 1.5m cycle lanes on each side of the 12m carriageway width. Item 8 Indicate on the relevant plans the pathway as described in Condition 24(d) Response Please refer to Drawing 1856-R37 demonstrating the proposed pedestrian pathway network configuration in front of Covenant J. The north verge of the Hofmann Drive road extension is proposed to contain a Stormwater Quality Improvement Device (SQID) here as this is the low point in the road catchment. Incorporating a pedestrian pathway along this frontage when there is already a pathway on the southern verge will compromise the ability to effectively locate a bioretention basin here without imposing on the existing boundary of Covenant J. It is understood that provision for a pedestrian connection to the frontage of proposed Lots 17-21 will be applied as conditions of future development for these lots. In order to provide a pedestrian connection to the network here, it is proposed that the pathway network divert all foot traffic to the southern verge where adjacent to the bioretention basin and then return it to the northern verge to provide future pedestrian connection along the frontage of Lots 17-21. Therefore, the pedestrian network connectivity is maintained, and suitable spatial provision is made for the SQID which is essential to clean stormwater discharge from the subdivision road network. Item 9 The proposed level of the roundabout at the Road B / Hofmann Dr intersection appears to be too high and creates possibly unnecessarily steep grades into Road B and Hofmann Dr from the roundabout. Provide an amended design that lowers the roundabout to improve these grades, or alternatively provide justification for the proposed design Response Please refer to Drawings 1856 R36, R45 and R48 with amended longitudinal grades for the approach and departure for Hofmann Drive and Road B with the proposed southern roundabout. These grades have been reduced to 6% in accordance with Austroads requirements. Please note the southern roundabout is at a predetermined level to ensure that the existing topographical site catchments are generally maintained. Road A, which grades out to the existing roundabout on Walter Hay Drive, has a very shallow gradient of 0.5%. If the roundabout surface levels were reduced, this would divert the eastern site catchment back towards Covenant J and the Hofmann Drive drainage reserve. 1856 – Stockwell Development Group – Noosa Civic Page 2 of 7
Page 3
Item 10 Provide design vehicle swept path diagrams for turning movements at intersections, to/from left turns only driveways, and the emergency access driveways. Response Please refer to Drawings 1856 T10-T15 which demonstrate the vehicle swept paths and are consistent with those drawings provided with the RAL18/0023 documents. Item 11 The diameter of the central islands of the two roundabouts appears to be too small. Provide amended plans that increase the diameter to be as large as possible while still accommodating the design vehicle. Response The diameter of the proposed north and south roundabout median islands is consistent with the traffic advice provided by Cardno for the Reconfiguration of Lots approval. That is, a 12m radius for the island as per Austroads Chapter 4B, Table 4.1, Row 3 and depicted on Drawings 1856- R58 and 1856-R60. Item 12 Provide amended plans that widen the central island at the eastern end of Hofmann Drive to the maximum achievable when design vehicle paths are considered (with less chevron painted areas). Response The chevron painted area to the south of the median splitter island west of the southern roundabout in Hofmann Drive was provided to maximise available turning area for truck swept paths into Hofmann Drive. This has been removed and replaced with island where possible based on the latest swept paths provided. Please refer to Drawings 1856 R58, R65 and T10. Item 13 Provide amended plans that indicate pedestrian facilities (pram ramps and splitter island crossings) on all legs of both new roundabouts. The features are to be located 6m clear of the roundabout circulating carriageway so that pedestrians can cross behind a vehicle waiting to enter the roundabout. Response Please refer to Drawings 1856 R65, R68 & R69 which demonstrate the additional pedestrian crossing locations in accordance with IPWEAQ RS-091 & 092. The pedestrian crossing at the southern end of Road C is set back further from the roundabout to address the driveway for Lot 9 and SQIDs on the eastern and western verges. Item 14 Provide amended plans that do not indicate access driveways except for those for lots specifically described in Conditions 8 and 19a. Response Please refer to Drawings 1856 R35-R42 which identify driveways to be constructed with the subdivision works and driveway that will be constructed with the future development of the lots. 1856 – Stockwell Development Group – Noosa Civic Page 3 of 7
Page 4
Item 15
Provide amended plans that indicate lockable gates to prevent regular use of the emergency
access for Lot 23, both on the driveway and on the central median crossing, together with
appropriate signage.
Response
Please refer to Drawing 1856-R40 demonstrating the emergency gate position and type. It is not
proposed to include any gate device in the central median breakthrough in Walter Hay Drive as
this is another access device that would need to be operated in an emergency, thereby slowing
down egress. The breakout in the central median island is proposed at only 6.2m wide to prevent
regular vehicles having sufficient space to use the breakout for U-turns.
Item 16
Provide a specific assessment by an RPEQ of the position of the emergency access location for
lot 23. The assessment must ensure that the most appropriate location is adopted taking account
of sight lines along both Walter Hay Drive carriageways as well as inherent bushfire emergency
access requirements. The access must be located to achieve the most appropriate balance of
having adequate sight lines onto Walter Hay Drive while also satisfying bushfire requirements
(being to have the access near the western end of lot 23).
Response
Please refer to Drawing 1856-R41 demonstrating the emergency egress location from Lot 23
including sight lines. Condition 8.1 of the court ordered approval requires the egress point to be
located in the north western section of the Lot 23 frontage.
Austroads Table 3.5 for crossing requires a 4 second critical acceptance gap (tc). From Table
3.6, the minimum sight distance should be 67m based on a 60km/hr approach speed or 89m
based on an 80km/hr approach speed. There is a high likelihood that the vehicle speed approach
will be significantly reduced in an emergency event where the gate is intended for use. Therefore,
the sight distance requirement based on the posted speed on 60 km/hr is deemed appropriate.
The below aerial screenshot verifies the sight distance shown on plans as approximately 70m
due to vegetation.
Figure 1: approximate sight distance from aerial map (Nearmap 2020)
1856 – Stockwell Development Group – Noosa Civic Page 4 of 7
Page 5
Item 17
Indicate on the relevant plans where on-street parking is proposed to be prohibited.
Response
Please refer to Drawing 1856-R65 which show line marking on Road B, restricting on street
parking to the Lot 16 frontage.
Item 18
Council has some concerns with the proposed horizontal alignment of the Hofmann Dr extension
and Road C, particularly the reverse curves on both roads and the small radius curve in Road C.
Provide assessment, prepared by an RPEQ, of the proposed horizontal alignment of Hofmann Dr
and Road C against the requirements of Council’s Engineering Design Standards.
Response
The straight tangents between the same direction corners in Hoffman and Road C have been
removed as part of this IR response and curves flattened to a wider radius where possible.
Reverse curves will still be necessary as a result of either alignment into a roundabout (Road C
to the proposed southern roundabout) or due to existing boundary lines (for Covenant J) and the
current construction alignment of the road pavement for Hofmann Drive. It is proposed these
reverse curves remain in the design. Please refer to Drawings 1856 R36, R37, R48 & R51 which
demonstrate the road alignment.
Item 21
Clarify if a further operational works application will be lodged to satisfy condition 49 or provide
updated plans to satisfy condition 49, and include access gate to Covenant L.
Response
Condition 49 of the court ordered approval requires a 1.8m high chainwire fence to the
development perimeter adjacent Covenant J on the Lot 17 boundary, the boundary of proposed
lots 12-15 and Lot 5 on SP222982, proposed Lot 12 and Lot 3 on SP182845, and the northern
boundary of Proposed Lot 23 and Lot 147 NPW889 (excluding within the Energex easement).
Please refer to Drawings 1856 R35-R38 & R41 which show the location and specifications for the
1.8m high chainwire fence in accordance with AS 1725.1 and gate locations to Covenant J from
Proposed Lot 17 and Lot 5 on SP222982 from Proposed Lot 13.
Item 29
Provide amended landscape plans showing landscaping to the splitter island, suitable for
pedestrian and vehicle sight lines
Response
Please refer to Drawing 1856-R40 which shows the Lot 23 splitter island to the Walter Hay Drive
Roundabout vegetated in coordination with the Landscape drawings. Please refer to landscape
drawings for details of treatments and vegetation to be installed in the splitter island.
Items 30-34
Response
Please refer to Drawings 1856-SW01-SW30 which have been amended as per the Information
Request Items to demonstrate the following:
· Extended Detention depths nominated to all bioretention cross sections
· Spot levels of road pavements, kerb inverts and footpaths added to bioretention cross
sections or new surface section details included for street trees
· DN100 PVC slotted underdrains shown on bioretention layout plans
· Verge services (water supply, sewer reticulation, communications, electrical and
stormwater pipes) are included on drawings.
1856 – Stockwell Development Group – Noosa Civic Page 5 of 7
Page 6
· Bollards to the perimeter of the swale and Bioretention basin in Road A have been
removed in favour of a barrier kerb with regular cut-outs. The upright barrier kerb is
reinforced with a concrete kerb backing strip to limit damage from wheel contact.
· Batter grades are amended with proposed extended detention depths to ensure the
ponding depth in street tree pits and basins remains below the kerb invert line. Therefore,
minor design storm kerb flow width/depth criteria in QUDM is a function of the bioretention
overflow pit level and calculations are consistent with those provided on Drawings 1856-
SW16-SW18
· Street Tree pits are not proposed to be grated and shall function effectively and
bioretention basins with WSUD species street trees for the subdivision works. Future
development of Lot 3 and 7 on private Road C may require these to be grated with a future
pedestrian application to the verge. The grates and restructure of the street tree basin
surfaces would occur at this time when there is clear information on the end use of the
road verges.
Item 36
If device sizes or extended detention depths are altered then provide an updated SWMP and
MUSIC modelling which demonstrates that the pollutant load reduction targets are met.
Response
Please refer to the below MUSIC model results screenshots and the attached MUSIC file to
demonstrate compliance with the NSC planning scheme and Qld SPP (2017) for water quality
outcomes in the proposed subdivision development.
Figure 2: Updated MUSIC Model Layout and Results
Item 37
Provide an amended preliminary Construction Management Plan that addresses Council’s
concerns.
Response
Please refer to updated Construction Management Plan enclosed with this response. Traffic
control and regular site vehicles are still proposed to enter the construction site from the existing
constructed end of Hofmann Drive. Vehicle parking and site offices will be located on Proposed
Lot 4 as per the submitted TGS documents. Heavy construction vehicles and deliveries shall enter
the construction site from the existing roundabout stub on Walter Hay Drive.
1856 – Stockwell Development Group – Noosa Civic Page 6 of 7
Page 7
Additional Comments Recent changes to supply chain in the civil construction industry have resulted in a significant reduction in the availability of Reinforced Concrete Pipe (RCP) to the region. It is understood that one supplier has effectively removed themselves from the SEQ market and the other main supplier is struggling to meet the demand increase for their product. We request that Fibre Reinforced Concrete Pipes be considered a suitable alternative to RCP for this development with rubber ring joints still provided as per Clause 2(i)(xi) of SC6.7 PSP6 – Engineering Standards in the Noosa Plan 2020. If you wish to discuss this matter further, please contact Cameron Landreth on (07) 5443 8285. Yours sincerely, CAMERON LANDRETH - Director BEng (Hons), NER, RPEQ 19358 For and behalf of; BARLOW SHELLEY CONSULTING ENGINEERS (AUST) PTY LTD Encl: Updated Civil OPW Drawings (1856 R30-R71 Rev D; 1856 SW01-SW30 Rev D; 1856 T10-T15 Rev A) Updated Construction Management Plan 1856-CMP-01 Version 2.0 MUSIC Model Rev 6. 1856 – Stockwell Development Group – Noosa Civic Page 7 of 7
Used in these records
1856 - Partial Response to Information Request - Barlow Shelley OPW20-0145.pdfRelated documentApplication case desk ↗
About this file
- File size
- 442 KB (small file)
- File type
No other editions are linked here.