Council archive · source document
1856 - Partial Response to Information Request - Barlow Shelley OPW20-0145 · OPW20/0145
Item 6 Amend the pathway width on the western side of Road C to be in accordance with Condition 17 Response Please refer to Drawings 1856 R36 & R39 which demonstrates this footpath width is compliant with Condition 17. The 3m footpath width is proposed to be initiated at the pedestrian crossing location to the eastern side of Road C as this ensures suitable verge width for Stormwater Quality Treatment devices and drainage structures in the verge and provides a clear transition point from a 2m wide footpath to 3m wide. Item 7 Road C is proposed with a 15m carriageway, compared with the 12m width required in Condition 17. Clarify how the proposed wider width is proposed to be used and operated. Response Please refer to Drawing 1856-R52 with additional information to confirm the design road reserve widths and pavement widths are compliant with Condition 17. The 15m carriageway (measured between kerb inverts or nominal face of kerbs) is inclusive of the 1.5m cycle lanes on each side of the 12m carriageway width. Item 8 Indicate on the relevant plans the pathway as described in Condition 24(d) Response Please refer to Drawing 1856-R37 demonstrating the proposed pedestrian pathway network configuration in front of Covenant J. The north verge of the Hofmann Drive road extension is proposed to contain a Stormwater Quality Improvement Device (SQID) here as this is the low point in the road catchment. Incorporating a pedestrian pathway along this frontage when there is already a pathway on the southern verge will compromise the ability to effectively locate a bioretention basin here without imposing on the existing boundary of Covenant J. It is understood that provision for a pedestrian connection to the frontage of proposed Lots 17-21 will be applied as conditions of future development for these lots. In order to provide a pedestrian connection to the network here, it is proposed that the pathway network divert all foot traffic to the southern verge where adjacent to the bioretention basin and then return it to the northern verge to provide future pedestrian connection along the frontage of Lots 17-21. Therefore, the pedestrian network connectivity is maintained, and suitable spatial provision is made for the SQID which is essential to clean stormwater discharge from the subdivision road network. Item 9 The proposed level of the roundabout at the Road B / Hofmann Dr intersection appears to be too high and creates possibly unnecessarily steep grades into Road B and Hofmann Dr from the roundabout. Provide an amended design that lowers the roundabout to improve these grades, or alternatively provide justification for the proposed design Response Please refer to Drawings 1856 R36, R45 and R48 with amended longitudinal grades for the approach and departure for Hofmann Drive and Road B with the proposed southern roundabout. These grades have been reduced to 6% in accordance with Austroads requirements. Please note the southern roundabout is at a predetermined level to ensure that the existing topographical site catchments are generally maintained. Road A, which grades out to the existing roundabout on Walter Hay Drive, has a very shallow gradient of 0.5%. If the roundabout surface levels were reduced, this would divert the eastern site catchment back towards Covenant J and the Hofmann Drive drainage reserve. 1856 – Stockwell Development Group – Noosa Civic Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
1856 - Partial Response to Information Request - Barlow Shelley OPW20-0145.pdfRelated documentApplication case desk ↗
About this file
- File size
- 442 KB (small file)
- File type
No other editions are linked here.