APPROVED PLAN
MCU24/0094
NOOSA COUNCIL
1 2 3 4 5 6 7 8 9 8 APRIL 2025
ngl +8m
ROSS
CRESCENT
ngl +1m
roof
RL24.100
ngl
3100
external
yoga retreat bathroom bed 06 terrace
first floor lv lv lv
RL21.000
3500
store garage
ground level
RL17.500
4000
lower ground
RL13.500
bal01 steel balustrade - type 1
bal02 steel balustrade - type 1
con02 off-form concrete
con03 board-form concrete
con04 honed concrete
fwt01 floor waste type 1
gls01 clear glass - type 1
lvg01 gravel
mtf01 metal flashing - type 1
mts01 metal sheeting
rnd01 rough render - dark
rnd02 rough tyrolean render - natural
rub01 rubber flooring
spa01 solar panel array
stc01 stone cladding - luca
stn01 natural stone crazypave - bodega
tbs01 timber batten screen
til01 floor tile - limestone tile
tim01 internal timber flooring
tsh01 shiplap/hardwood wall and ceiling lining
general notes general items legend
RL 60.200 spot level L1 (level) window code. refer to window component code. 20 step down code. note step line
1. all works to be carried out in accordance with the general construction 6. levels and services locations for civil works may vary from those shown -
notes in coversheets of this package. verify all levels and services locations prior to commencement of tos = top of step w01 (window ref) elevations + door/window dp01 (refer material code for similar) occurs on low side of level
2. all works to be carried out in accordance with the DA (if required) and BA construction. bos = bottom of step hardware schedules low lvl low lvl + 20 mm change
including drawings & conditions. 7. concrete profile and blockwork setout is provided on 220 (series) of RL = lvl at point (AHD typ)
3. handrails are required to all stairways where a change of level of drawings, refer to these for setout. licensed surveyor to establish grids.
RL xx.xxx top of wall (surface) level door/gate code. refer to window ceiling code hose cock. refer serivces
1000mm or greater occurs as per BCA 2013 Part 3.9.2.4. where discrepancies occur the 220 series drawings are to take L1 (level)
d01 elevations + door/window 2700 * heights are relative to assocaited schedule. client to confirm
4. where boundary locations are not clear, the builder shall arrange for precedent. (door/gate ref) height* hc
hardware schedules Ipb01 finish** finished floor locations
survey to locate the boundaries and complete an identification survey
* refer finishes schedule
prior to setting out the new work. SSL xx.xxx structural slab level
5. contours shown are existing and do not represent finished levels.
material code. refer finishes J0.1 joinery code. refer to cabinetry (cos) check on site
Ipb01 Ipb01 schedule (typical). elevations on 820 (series) and (mir) mirrored detail
FFL xx.xxx finished floor level (refer also to sanitary/ applicances/
level joinery
details on 830 (series) drawings (sim) similar detail
reference
lighting/services as appropriate) (part) partial detial
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0427
RW
NM
A
B
15/04/24
30/05/24
SD Client Issue 01
SD Client Issue 02
33 Ross Crescent, L&S Hamill building sections SD 400.00 C SCALE As
indicated
Sunshine Beach
A3
RW C 17/06/24 SD Client Issue 03 section a
schematic design
1:1 @
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Document Set ID: 23123221
Version: 1, Version Date: 24/07/2024
[OCR of page images]
APPROVED PLAN
MCU24/0094
NOOSA COUNCIL
8 APRIL 2025
ROSS
CRESCENT
ngl +1m
roof ~
V / RL24.100
first floor
RL21.000
| tt il
Yous OOS POM
QOREROQECRERR
Ds > LYONS Py
ERKILKIREERR K « x « RARER
YY POY) IY LY ZY », YP Y YY YY Y YY» Ye PYYPYYYY
SKK RE Zi & LOG LRU ORR, RRR
YYX YY) YY”YYYS S YY” YP » YD »» IY,
OOOO EK,
|
ground level DY VOY ie
RL17.500 KREKARAARC ZS {
s y y
lower ground KRRRKQRARERRRE
Vann LLB SA YS IIIT Dye SISSY —'SSASES YY
< RRO RR x LYK RRR, RY, q LROERQRQQo
WYO S S DONS SNNYLDYYYQONYN y PONY YQ0°LYOY
PROROROR IRR OR ORR RZ, ORL OGG COGGLG Y VIR ROR IRR
RQ I SIRKARARKAIELRAS SRR RERERKEAREARLRARLR IC LAREREREE R SLREIRREREAA
4 YS > yy Y YY
LS RRKEL WK KEK KLKRAKSS y SSS OX —SSSS ISIE
INIRK_KAEIELNSIRLINR KES INS
. S S | . SOHN
x RRL XQ ° RRQAEIRQGR KREURQREC RRR RRA
steel balustrade - type 1 UY RIL » ; RUROX ORIRIRO RII
steel balustrade - type 1 ‘ . . MASS SANG
off-form concrete
board-form concrete
honed concrete
floor waste type 1
clear glass - type 1
gravel
metal flashing - type 1
metal sheeting
rough render - dark
rough tyrolean render - natural
rubber flooring
solar panel array
stone cladding - luca
natural stone crazypave - bodega
timber batten screen
floor tile - limestone tile
internal timber flooring
shiplap/hardwood wall and ceiling lining
LX.
ZX
x
(a
A
SSS
Sf RR S
RAE
xX
YY
WS
RG,
ve
2,
\
yx
ZX
XY,
DSSS
CER
SON
KAAS
SWISS
LYN.
KLAR
LSE
YL,
SS
SS
x
Qe
PROLOG
x
SISSY
Ss SS
y
2,
SK
SSS
OGY
KKK
LRA
CK
xy
KK
ES
RG
YY
LRCRAN
Gy
xz
GZ
Ke
general notes general items legend
ae j “oc inean it it 20
all works to be carried out in accordance with the general construction . levels and services locations for civil works may vary from those shown - <p ru.c0200 | sptieve | window ode refer to window |eomponent Cade. , | step down cove note step tn
elevations + doorlwindow oem ae nda occurs on low side of level
:
notes in coversheets ofthis package. verify all evels and services locations prior to commencement of |
all works to be carried out in accordance with the DA (if required) and BA construction. low | lowia+20mm | change
including drawings & conditions. concrete profile and blockwork setout is provided on 220 (series) of
handrails are required to all stairways where a change of level of drawings, refer to these for setout. licensed surveyor to establish grids - - :
400mm or greater occurs as per BCA 2013 Part 3.9.2.4. where discrepancies occur the 220 series drawings are to take | ‘op of wall (surface) level (eve) doorgate cogs. refer to window ceing code at 4 | nose cack ee eos
where boundary locations are not clear, the builder shall arrange for precedent. Oy fevalons ooruindow rm | tet mare rotalive to SSC foster peri te Conny
survey to locate the boundaries and complete an identification survey + | Tarcware schedules ne ree schedule |[oraions
prior to seting out the new work. structural slab level
contours shown are existing and do not represent finished levels. | }— — —— — +
material code. refer finishes ee joinery code. refer to cabinetry check on site
: schedule typical). elevations on 820 (series) and mirrored detail
“Tress for ve | (refer BG a applicances! ton Toone | details on 830 (oon a i | similar detail
| htingsenices as appropriate) | | pata deta
tos = top of step
| bos = bottom of step | hardware schedules
RL = Il at point (AHD typ)
(doorigate ref)
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV Pelton irees
shaun lockyer architects RW A a5/oa/a8 $0 Clent sue OL 33 Ross Crescent, L&S Hamill building sections SD 400.00 c [git iS
NM B 30/05/24 SD Client Issue 02 late lor 1eTo]
www.lockyerarchitects.com.au . 07 3257 7288 RW c 17/06/24 SD Client Issue 03 Sunshine Beach section a schematic design
se A3
nominated architect: Shaun Lockyer 3455 QLD . 9377 NSW
Docdrrehr sdf 29 99. Powepsions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Version: 1, Version Date: 24/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.