Original source · versioned page text
Consolidated Set Approved Plans - MCU24 0094 (As Published)
Plans and drawings: the text below has words only, no drawings.
Very large file (44.5 MB): may take a few minutes to open.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
APPROVED PLAN
MCU24/0094
NOOSA COUNCIL
8 APRIL 2025
9 8 7 6 5 4 3 2 1
ngl +8m
front boundary
front setback
ROSS
CRESCENT
ngl +1m
rnd01
roof deck ngl
roof
RL24.100
3100
master robe
bed
first floor
RL21.000
3500
dining kitchen pantry
dry cavity
outdoor dining
ground level
RL17.500
firepit
4000
rumpus
lower ground
RL13.500 gym
lv lv
bal01 steel balustrade - type 1
bal02 steel balustrade - type 1
con02 off-form concrete
con03 board-form concrete
con04 honed concrete
fwt01 floor waste type 1
gls01 clear glass - type 1
lvg01 gravel
mtf01 metal flashing - type 1
mts01 metal sheeting
rnd01 rough render - dark
rnd02 rough tyrolean render - natural
rub01 rubber flooring
spa01 solar panel array
stc01 stone cladding - luca
stn01 natural stone crazypave - bodega
tbs01 timber batten screen
til01 floor tile - limestone tile
tim01 internal timber flooring
tsh01 shiplap/hardwood wall and ceiling lining
general notes general items legend
RL 60.200 spot level L1 (level) window code. refer to window component code. 20 step down code. note step line
1. all works to be carried out in accordance with the general construction 6. levels and services locations for civil works may vary from those shown -
notes in coversheets of this package. verify all levels and services locations prior to commencement of tos = top of step w01 (window ref) elevations + door/window dp01 (refer material code for similar) occurs on low side of level
2. all works to be carried out in accordance with the DA (if required) and BA construction. bos = bottom of step hardware schedules low lvl low lvl + 20 mm change
including drawings & conditions. 7. concrete profile and blockwork setout is provided on 220 (series) of RL = lvl at point (AHD typ)
3. handrails are required to all stairways where a change of level of drawings, refer to these for setout. licensed surveyor to establish grids.
RL xx.xxx top of wall (surface) level door/gate code. refer to window ceiling code hose cock. refer serivces
1000mm or greater occurs as per BCA 2013 Part 3.9.2.4. where discrepancies occur the 220 series drawings are to take L1 (level)
d01 elevations + door/window 2700 * heights are relative to assocaited schedule. client to confirm
4. where boundary locations are not clear, the builder shall arrange for precedent. (door/gate ref) height* hc
hardware schedules Ipb01 finish** finished floor locations
survey to locate the boundaries and complete an identification survey
* refer finishes schedule
prior to setting out the new work. SSL xx.xxx structural slab level
5. contours shown are existing and do not represent finished levels.
material code. refer finishes J0.1 joinery code. refer to cabinetry (cos) check on site
Ipb01 Ipb01 schedule (typical). elevations on 820 (series) and (mir) mirrored detail
FFL xx.xxx finished floor level (refer also to sanitary/ applicances/
level joinery
details on 830 (series) drawings (sim) similar detail
reference
lighting/services as appropriate) (part) partial detial
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV PROJECT NO 0427
RW
NM
A
B
15/04/24
30/05/24
SD Client Issue 01
SD Client Issue 02
33 Ross Crescent, L&S Hamill building sections SD 400.01 C SCALE As
indicated
Sunshine Beach
A3
RW C 17/06/24 SD Client Issue 03 section b
schematic design
1:1 @
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Document Set ID: 23123221
Version: 1, Version Date: 24/07/2024
[OCR of page images]
roof
RL24.100
q
_-7 Toof deck
\
\
front boundary
first floor
RL21.000
master
bed
APPROVED PLAN
MCU24/0094
NOOSA COUNCIL
8 APRIL 2025
“_— ngl +8m
ROSS
CRESCENT
ngl +1m
ground level
RL17.500
W_R113.500
dining
LKR
YOY
{KKK
RRA
lower ground
rumpus. -—-~~]
ZORRO
RRR
RR
Ce
Z
IIS
SS
RRR
» VOIX y
SAAN
RRR
YY? Y
PL Y LRz
LSSSLS ~D?D—SSPASSKS
SSISSSS
RRR RRR
steel balustrade - Noes »
steel balustrade - type
off-form concrete
board-form concrete
honed concrete
floor waste type 1
clear glass - type 1
gravel
metal flashing - type 1
metal sheeting
rough render - dark
rough tyrolean render - natural
rubber flooring
solar panel array
stone cladding - luca
natural stone crazypave - bodega
timber batten screen
floor tile - limestone tile
internal timber flooring
shiplap/hardwood wall and ceiling lining
KREIEKEIKA
RROOYIIY
RRR
YS
GLGGOO
Ny
VIREO
SS SS |
KRY
Y/
IIIS
RQ-KQQKK
YOO
SSS SS yy
SA LSA
YOY
KIRKREXKQRQRG
ROR ORD
KK & KK YR
YROLRE
SSS
‘A
SSS
RRQRORRORORROE
RRR
SS
QE
SLING
RIL. >
xR
ONY, S
4 ROR ROR
\ NINE KKK
general notes
general items legend
all works to be carried out in accordance with the general construction
notes in coversheets of this package.
all works to be carried out in accordance with the DA (if required) and BA
including drawings & conditions.
handrails are required to all stairways where a change of level of
100mm or greater occurs as per BCA 2013 Part 3.9.2.4.
where boundary locations are not clear, the builder shall arrange for
survey to locate the boundaries and complete an identification survey
prior to setting out the new work.
contours shown are existing and do not represent finished levels.
levels and services locations for civil works may vary from those shown -
verify all levels and services locations prior to commencement of
construction.
concrete profile and blockwork setout is provided on 220 (series) of
drawings, refer to these for setout. licensed surveyor to establish grids.
where discrepancies occur the 220 series drawings are to take
precedent.
|spotievel
tos = top of step
| bos = bottom of step
RL = Il at point (AHD typ)
-<b- RL 60.200
| top of wall (surface) level
structural slab level
"Thnished foo level
ui
Cy
(vet
(doorigate ref)
| window code. refer to window
elevations + dooriwindow
| hardware schedules
doorlgate code. refer to window
elevations + dooriwindow
| hardware schedules
material code. refer finishes
| Schedule (typical).
(efer also to sanitary/ applicances/
| lighting/services as appropriate)
| component code.
| (refer material code for similar)
ceiling code
ean | heights are relative to assocaited
fst finished floor
* refer finishes schedule
Sp ai code. refer to cabinetry
soe [elevations on 820 (series) and
lett L joinery
trnce details on 830 (series) drawings
20 | step down code. note step line
occurs on low side of level
tot Fowntszoem | change
hose cock. refer serivees
| schedule, cent to confirm
| locations
check on site
| mirored detail
similar detail
| partial detial
DRAWN REV
shaun lockyer architects awk
www.lockyerarchitects.com.au .
NM B
O07 3257 7288 RW c
nominated architect: Shaun Lockyer 3455 QLD . 9377 NSW
DATE ISSUE
15/04/24 SD Client Issue 01
30/05/24 SD Client Issue 02
17/06/24 SD Client Issue 03
PROJECT
33 Ross Crescent,
Sunshine Beach
CLIENT
L&S Hamill
DRAWING NAME
building sections
section b
PHASE DWG NO REV
SD 400.01 Cc
schematic design
PROJECTNO 0427
Ror \ 83 oN
indicated
A3
1:1@
Docdrrehr sdf 29 99. Powepsions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
Version: 1, Version Date: 24/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.