SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 7 MAY 2019
INFRASTRUCTURE SERVICES DEPARTMENT
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Asset Management
Capital Works Program - The The preparation of the draft 10 year Participate in Councillor workshops Review the process for the
development from a 5yr capital works capital program for Councillor for having the 10 year capital development of the 10 year capital
program to a 10 year capital works budget workshops. program endorsed by Council. program to ensure continued
program that is aligned to Councils long improvement and alignment with the
term financial planning. long term financial plan. .
Ongoing condition assessments Procurement of the Level 3 bridge Undertake the procurement for the The procurement of all level 3
across all asset classes i.e. assessments for Burgess Creek remaining level 3 bridge inspections bridges that are required for
Stormwater, Buildings and the Main Bridge (Sunrise Beach) and Victor that are required. inspection – completed.
Beach Slurry System Giles Bridge (Cooran) have been Complete the tender evaluation for Consider additional condition
completed and a consultant the Stormwater CCTV inspections. assessments on components of
appointed. Buildings.
It was resolved to retender the Appoint of a successful tender for
CCTV stormwater condition Stormwater CCTV inspections.
assessments.
Complete detailed asset management Stormwater Infrastructure AMP was Complete the Buildings and Have the Buildings and Facilities
plans for identified pilot areas. Roads adopted at the February meetings. Facilities AMP. AMP adopted by Council and
infrastructure December 2018, commence the Parks &
Stormwater February 2019, Buildings Playgrounds AMP.
April 2019 and Parks & Playgrounds
June 2019.
Asset Management Road Map - Preparation of the 10 year capital Review of current asset system data Continue with the development of
Ongoing implementation of the initiatives works program for budget and reconciliation of asset data. asset data structure across all asset
identified in the Asset Management workshops. classes.
Road Map Review of Buildings and facilities
data structure in preparation for the
AMP.
Awareness and development of Asset Workshop held with Civil Works Prioritization of AM system issues to Trial new mobility hardware for
management functions across the supervisors to identify issues with improve asset data capture and future development of asset data
organisation. AM system for improvement and collection. collection and improved usability.
Awareness training and corporate asset development. Undertake specific and detailed Further development of the Road
system development. Specifically, Work Initial road infrastructure working Asset Systems training for Infrastructure priorities and
Order management implemented group held in January. specialized staff. improvements through the road
through the majority of the organization. infrastructure working group.
Page 54 of 71
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.