Original source · versioned page text
2019-05-07 Services & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 7 MAY 2019
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Business as Usual activities Construction completed or Recruitment of Contract Delivery of Peregian Beach
underway on Musavale Road slip Superintendent Officer and 2 Amenities, for the Botanic Gardens
repair, Pacific Avenue upgrades, Project Coordinators. Shade structure, Peregian Beach
demolition of SLSQ building, Finalisation of tender documents for amenities, boardwalk.
Poinciana Avenue pathway stage 3, Peregian Beach Boardwalk, Rufous Consultation and grant funding for
Swan Avenue creek restoration, Street Stage 3 and Gympie Terrace Noosa Parade corridor upgrade.
Grosvenor Terrace stormwater Stormwater. Tender for Hilton Terrace corridor
upgrade, and Castaways Beach Designs progressing for Noosa upgrade Stage 1 works.
carpark upgrade, Bicentennial Parade corridor, Black Mountain
Carpark upgrade, Munna Point V- Road.
Drain and Noosa Botanic Gardens
Design support for Tewantin Bypass
shade structure, Stan Topper Park
- Beckman’s Road, Cooroy
Basketball renewal, Jo Bazzo Park
Connection Roads projects and
BBQ and pathways, Noosaville
Transport Strategy.
Library weather protection and
Cooroy Library Air conditioner plant Delivery of Hilton Terrace service
room enclosure. relocations.
Designs underway for Peregian
Beach Boardwalk, Project Avenue
stormwater upgrade, Witta Circle
traffic calming, Rufous Street
carpark, Black Mountain Road,
Peregian Amenities, Peregian Town
Square, Sea Eagle Drive safety
improvements, O-Boats retaining
wall, Gympie Terrace Stage 2.
Tendering for Peregian Beach
amenities, Orealla Crescent Bridge
and Noosa North Shore
Campground.
Transport Strategy
Investigate key transport strategies in Successful implementation of the Delivery of the Go Noosa – Easter Qld Treasury Corporation evaluation
the Noosa Transport Strategy 2017- Go Noosa - Christmas traffic and traffic & transport trials of the Go Noosa trials (Christmas &
2027. transport trials with over 203,000 Evaluation of the Go Noosa - Easter)
bus trips over the 6 week period and Christmas traffic & transport trials Transport Strategy updates.
a 41% increase in patronage on last Finalise the ‘look ahead’ program.
year’s data.
Page 60 of 71
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.