Skip to the record
Accept no substitutions.

Original source · versioned page text

2019-05-07 Services & Organisation Committee Agenda

of 71

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                              7 MAY 2019


BRANCH ACTIVITIES                         RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                          THE NEXT QUARTER
Business as Usual activities                 Construction      completed       or      Recruitment         of      Contract      Delivery    of   Peregian   Beach
                                               underway on Musavale Road slip              Superintendent Officer and 2                Amenities, for the Botanic Gardens
                                               repair, Pacific Avenue upgrades,            Project Coordinators.                       Shade structure, Peregian Beach
                                               demolition of SLSQ building,              Finalisation of tender documents for        amenities, boardwalk.
                                               Poinciana Avenue pathway stage 3,           Peregian Beach Boardwalk, Rufous          Consultation and grant funding for
                                               Swan Avenue creek restoration,              Street Stage 3 and Gympie Terrace           Noosa Parade corridor upgrade.
                                               Grosvenor     Terrace    stormwater         Stormwater.                               Tender for Hilton Terrace corridor
                                               upgrade, and Castaways Beach              Designs progressing for Noosa               upgrade Stage 1 works.
                                               carpark    upgrade,     Bicentennial        Parade corridor, Black Mountain
                                               Carpark upgrade, Munna Point V-             Road.
                                               Drain and Noosa Botanic Gardens
                                                                                         Design support for Tewantin Bypass
                                               shade structure, Stan Topper Park
                                                                                           -    Beckman’s      Road,    Cooroy
                                               Basketball renewal, Jo Bazzo Park
                                                                                           Connection Roads projects and
                                               BBQ and pathways, Noosaville
                                                                                           Transport Strategy.
                                               Library weather protection and
                                               Cooroy Library Air conditioner plant      Delivery of Hilton Terrace service
                                               room enclosure.                             relocations.
                                             Designs underway for Peregian
                                               Beach Boardwalk, Project Avenue
                                               stormwater upgrade, Witta Circle
                                               traffic calming, Rufous Street
                                               carpark, Black Mountain Road,
                                               Peregian Amenities, Peregian Town
                                               Square, Sea Eagle Drive safety
                                               improvements, O-Boats retaining
                                               wall, Gympie Terrace Stage 2.
                                             Tendering for Peregian Beach
                                               amenities, Orealla Crescent Bridge
                                               and      Noosa      North     Shore
                                               Campground.

Transport Strategy
Investigate key transport strategies in      Successful implementation of the          Delivery of the Go Noosa – Easter         Qld Treasury Corporation evaluation
the Noosa Transport Strategy 2017-             Go Noosa - Christmas traffic and            traffic & transport trials                  of the Go Noosa trials (Christmas &
2027.                                          transport trials with over 203,000        Evaluation of the Go Noosa -                Easter)
                                               bus trips over the 6 week period and        Christmas traffic & transport trials      Transport Strategy updates.
                                               a 41% increase in patronage on last       Finalise the ‘look ahead’ program.
                                               year’s data.


                                                                                                                                                            Page 60 of 71
Log in to download the original file

2019-05-07 Services & Organisation Committee Agenda(PDF, 4MB).pdf · 4.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.